Prefabricated House Construction Team
The prefabricated house construction team is a specialized operation team engaged in building construction and decoration, responsible for the on-site assembly and construction management of prefabricated houses.

Team Composition and Responsibilities
The prefabricated house construction team typically consists of team leaders, part-time safety officers, and multi-skilled workers. The team leader is responsible for coordinating the construction schedule and facilitating collaboration among different trades. The part-time safety officer monitors the implementation of on-site safety regulations to ensure compliance with the Implementation Rules for Pre-shift Meetings and Three Inspections by Construction Teams, which include pre-shift status checks, safety briefings, and the three-inspection system (before, during, and after shifts). Processes are recorded and supervised through an internet platform. Workers cover trades such as carpentry, masonry, and plumbing and electrical installation, requiring multi-skilled operation capabilities to adapt to the modular construction characteristics of prefabricated houses.
Construction Process and Technical Features
The core of prefabricated house construction is modular assembly, with different regions adopting differentiated techniques:
- Henan Model: Primarily using cement board components, construction resembles building with blocks. After prefabricated cement boards are transported to the site, several workers quickly assemble them using lifting equipment, completing the assembly of a house in 4 hours at a cost as low as 300 yuan per square meter (approximately 60,000 yuan for a 200-square-meter rough-finished house). This model relies on standardized component design, reducing on-site wet work and significantly shortening the construction period.
- South Korean Model: Utilizing factory-prefabricated structural components such as load-bearing columns and beams, precise assembly is achieved using cranes (aligning protrusions with grooves and securing with nuts), completing the second-floor framework in half a day. Subsequent steps include floor slab installation, foam sealant application, secondary grouting at load-bearing column connections, and finally laying steel mesh and pouring concrete to form an integrated structure. This model emphasizes component precision and connection strength, suitable for multi-story buildings.
Standardized Management and Advantages
Modern construction teams must adhere to standardized management systems, clarifying tasks and risk points during pre-shift meetings, inspecting and correcting violations during shifts, and summarizing and improving processes after shifts. The application of internet platforms enables real-time uploading of construction data, facilitating progress and quality tracking by owners and regulatory authorities. The advantages of prefabricated house construction lie in high efficiency, low cost, and strong environmental protection: modular production reduces material waste, and on-site assembly lowers noise and dust pollution, aligning with green building development trends.