The construction process of prefabricated houses varies depending on the type and design, with the following being a common process:

Foundation Construction: This is the initial step in the entire construction process. First, the foundation must be leveled to ensure that the ground flatness meets the requirements, followed by pouring a cushion layer. Next, excavate the foundation pit to the specified depth according to the design requirements. To prevent water loss during subsequent concrete pouring, plastic sheeting should be laid inside the foundation pit. Finally, pour concrete, which will form a solid foundation after solidification, providing a firm base for subsequent construction.

Installation of Foundation Piles and Beams: After the concrete of the foundation has solidified to a certain strength, the installation of anchor plates begins, which serve to secure the foundation piles. Use a mobile crane to install the prefabricated foundation piles at the designated locations, with each pile weighing approximately 5 tons. After the foundation piles are installed, proceed with the assembly of the beams, firmly securing them to the foundation piles with nuts. For gaps that arise during the assembly process, use expanding foam to fill them, ensuring the structural airtightness and stability.

Production of Modular Building Components: This stage is primarily completed in a factory. The entire building is disassembled into multiple independent modules, and the prefabricated production of components such as ceilings, floors, walls, and plumbing and electrical systems is efficiently completed using parallel operations and automated production lines. This production method not only improves production efficiency but also ensures the quality and precision of each component.

On-site Assembly: After the prefabricated modules are transported to the construction site, use large equipment such as tower cranes to carry out precise assembly operations based on the detailed identification information on each module, ensuring that all modules can be perfectly connected to form a complete building structure.

Backfilling and Foundation Pouring: After completing the construction of the foundation frame structure, proceed with backfilling the soil to fill and compact the gaps around the foundation. Afterward, pour concrete again to further enhance the overall integrity and stability of the foundation, forming a complete and sturdy foundation.

Treatment of Component Gaps: Perform grouting treatment on all gaps between components. By filling with special grouting materials, the components are tightly bonded, effectively improving the structural stability and airtightness, preventing issues such as leakage.

Unfolding of Foldable Prefabricated Houses: For foldable prefabricated houses, after completing all interior finishes and system integration in the factory, they can be folded and packed into containers for transportation. Upon arrival at the construction site, only simple unfolding operations on the ground are required, along with connecting to water and electricity supplies, enabling quick commissioning.