Prefabricated House Construction Plan

Admin 18 de septiembre de 2026

The prefabricated house construction plan covers stages such as design, production, transportation, and installation, requiring adherence to standardized and modular principles, and systematic planning that combines functional requirements with construction efficiency.

Design Phase: The design phase should prioritize functional requirements while considering structural safety and green concepts. Architectural floor plan design should optimize spatial layout, while facade design should focus on combining aesthetics with practicality. Structural design should ensure stability through mechanical calculations, and equipment selection should match the house's functions (e.g., enhanced sound insulation and temperature/humidity control for homestays). Material selection should comply with environmental standards, prioritizing recyclable or low-energy materials. Modular design is crucial, enabling rapid assembly through standardized components. For example, triangular wooden houses with unique shapes can attract visitors to scenic spots, while homestays should maintain consistent comfort standards.

Production Phase: Strict quality control of components is essential during production. Prefabricated components should be produced using high-precision molds to ensure dimensional accuracy within millimeters and smooth, defect-free surfaces. Connection node designs should undergo experimental verification of strength, meeting seismic requirements when using bolts or welding processes. Production should comply with standards such as the 'Technical Standard for Prefabricated Concrete Buildings.' Component inspection should include strength testing and leakage detection, and packaging should use shock-absorbing materials to protect component edges and corners.

Transportation Phase: Transportation methods should be selected based on component characteristics. Large wall components are best transported on flatbed trucks, while irregularly shaped components (e.g., triangular roofs) require custom-made supports. Transportation routes should be planned in advance to avoid height and width restrictions and construction areas. Vehicles should be equipped with GPS positioning and tilt sensors to monitor component status in real-time. For example, inter-provincial transportation should consider weather conditions, covering components with waterproof cloth in rainy or snowy weather to prevent deformation from moisture.

Installation Phase: The installation phase should follow the principle of 'foundations first, then the main structure.' Site preparation should include foundation treatment and positioning layout. Component lifting should use truck cranes or tower cranes, with lifting points confirmed through structural calculations. Component connections should use dry methods (e.g., bolt connections) or wet methods (e.g., grouting connections), followed by adjustments for verticality and flatness with errors controlled within 5mm. Acceptance should check node strength and waterproofing, with bathroom modules undergoing a 24-hour closed-water test.

Modular buildings offer significant advantages, reducing construction periods by 60%, on-site labor by 50%, and noise and dust pollution by over 80%. Their applications are diverse, with functional modules quickly constructing reception centers for urban renewal projects, comfortable modules replacing existing residences in old neighborhood renovations, and attraction-type characteristic wooden houses suitable for scenic campgrounds. Through a combination of industrial production and on-site assembly, prefabricated houses are becoming an efficient and environmentally friendly new model of construction.