PC High-rise Prefabricated Housing

Admin 18 de septiembre de 2026

PC high-rise prefabricated housing refers to high-rise buildings constructed using prefabricated concrete technology, with factory-made components assembled on-site. This approach features standardized production, reduced on-site workload, and shorter construction periods.

Construction Process Requirements

  • On-site Preparation: Complete the "three supplies and one leveling" (road, water, and electricity access, along with site leveling). Set up temporary facilities and storage areas for PC components, and equip the site with vertical transportation equipment such as tower cranes. For example, tower cranes should be selected based on component weight and lifting height to ensure coverage of the entire construction area.
  • Off-site Coordination: Establish communication mechanisms with PC component manufacturers, clarifying their addresses, production capacities, and transportation routes. Develop an overall construction plan and a schedule for component delivery. Additionally, dispatch quality personnel to the manufacturers for inspections, checking key indicators such as component dimensional deviations, concrete strength, and the positions of embedded parts.

Prefabricated Construction Phases

  • Factory Production: Professional prefabrication units divide production lines according to component types (e.g., prefabricated exterior wall panels, stairs, balcony panels, bay window panels, and equipment platforms), using standardized molds and automated equipment. For example, prefabricated exterior wall panels require reserved openings for doors and windows and embedded pipelines to ensure precise connections with the main structure.
  • Transportation and Fixing: Before loading components onto vehicles, install dedicated lifting frames and secure them with bolts or straps to prevent sliding or tipping during transportation. Components transported flat (e.g., balcony panels) should be supported with full-length wooden strips at intervals, with a stacking height not exceeding three layers and a total height not exceeding 1.5 meters. Vehicles should减速 (reduce speed) when starting and turning to avoid damage caused by sudden braking.

Technological Development History

China's prefabricated concrete technology began in the 1950s, initially used for factory and residential construction. In the 1970s, driven by the policy of "three modernizations" in construction (standardized design, industrialized component production, and mechanized construction), technical systems such as large-panel structures and box structures emerged. After the 21st century, due to increased production efficiency and environmental protection demands, companies like Vanke developed prefabricated shear wall residential structural systems and applied prefabricated frame technology, extending the technology to high-rise building construction.