Outdoor Mobile Toilet Installation Guide
The installation of outdoor mobile toilets should be carried out according to specifications based on their types, mainly including general installation, rental installation, and special-type installation. The specific steps are as follows:

I. General Installation Preparation and Basic Steps
- Tool Preparation: After receiving the goods, prepare tools such as an electric drill, a 4.2-millimeter drill bit, a rivet gun, and a level. Ensure that the installation environment is dry and well-ventilated, and the ground is flat and free of debris.
- Main Body Assembly: Install the inner corner pieces one by one at the corners of the frame to ensure a tight connection. Insert the panels into the slots and align them, checking that the gaps are even to avoid structural instability due to misalignment.
- Fixing and Reinforcement: After aligning the panels, drill holes at the connection points (the depth should penetrate the panels), insert rivets, and fix them with a rivet gun. Focus on reinforcing load-bearing parts such as door frames and bases to prevent loosening during use.
II. Rental Mobile Toilet Installation Specifications (Taking Xuchang as an Example)
- On-site Survey and Planning:
- The rental company needs to visit the site to measure it, avoiding dangerous areas such as low-lying waterlogged areas and high-voltage lines. Ensure that the distance between the toilet and the main activity area is no more than 30 meters on foot, and set up clear指示 signs.
- Plan the number of toilets according to the foot traffic. Generally, configure one toilet stall for every 50-100 people to avoid queuing congestion.
- Basic Installation Requirements:
- Level Placement: Use a level to adjust the toilet base to ensure that all four corners are stable, preventing tilting that could lead to poor drainage or structural damage.
- Sewage Connection: The sewage pipe needs to be connected to the municipal sewer network or a designated collection point with a slope of no less than 2% to avoid sewage backflow or overflow. If using an independent collection bucket, reserve a clearance channel.
- Water and Electricity Safety: The water and electricity lines should be buried underground or protected with sleeves. Electrical facilities (such as lighting and exhaust fans) should be waterproofed to prevent electric shock. A check valve should be installed for the water source connection to avoid backflow contamination.
III. Special-Type Mobile Toilet Installation (Taking a Stainless Steel Waterless Packing Squat Toilet as an Example)
- Installation Method Selection:
- Floor-mounted Type: Directly placed on the ground, suitable for temporary events or flat sites. The base needs to be fixed with expansion bolts to prevent displacement.
- In-ground Type: Requires excavating a pit with a depth of no less than 50 centimeters, burying the main body of the toilet, and then backfilling and compacting. Suitable for long-term fixed sites, with stronger stability.
- Sewage-free Treatment:
- The toilet is equipped with built-in packing bags, and excrement is automatically sealed without the need to connect to a sewage pipe. Simply replace the packing bags regularly. It is suitable for waterless areas, construction sites, or scenic spots.
- During installation, check that the sealing ring is intact to avoid odor leakage. For in-ground types, reserve a maintenance port for easy later maintenance.
Precautions: After installation, conduct a comprehensive inspection of structural stability, water and electricity safety, and sewage discharge function, and perform a trial run to ensure that there are no water leaks, electric shocks, or odor problems before putting it into use.