Although the installation drawing of the container house in the north area is not directly provided, the general steps and key points for the installation of container houses can be offered:

Bottom Frame Installation

  • Ground Preparation: Installation should be carried out on a flat ground or tooling platform to ensure the ground is solid and level, providing a stable foundation for subsequent installation.
  • Connection of Bottom Corners and Bottom Beams: Connect the bottom corners of the container to the bottom beams using hexagon socket bolts, but do not tighten them temporarily. After adjusting the bottom frame to ensure that the diagonal difference is ≤3mm, tighten the bolts to ensure the squareness and stability of the bottom frame.
  • Installation of π-shaped Secondary Beams: Install the π-shaped secondary beams according to the positions of the positioning holes on the long beams and fix them with m5.519 self-tapping screws. At the same time, the top of the π-shaped secondary beams and the bottom beams should be fixed with st4.816 round-head drill-tail screws to enhance structural stability.

Floor Laying

  • Base Plate Laying: Lay the floor base plates (such as magnesium oxide boards) along the 6-meter direction. The base plates at both ends have been pre-punched and need to be cut at an angle according to the drawn chalk lines to ensure that the base plates fit the bottom frame.
  • Marking and Plate Laying: Make marks at the center lines of the π-shaped beams and start laying the floor from one end, ensuring that the joints of the two floor plates coincide with the center lines of the π-shaped beams. After laying, draw chalk lines on the floor according to the marks (two chalk lines are required at the joints, each deviating 20mm from the center line), and fix the floor plates along the chalk lines with st4.2*38 cross-head flat-head self-tapping screws, with a nail spacing of 300 - 350mm.
  • Floor Treatment: Sand the entire floor, especially the plate joints, apply PVC special floor adhesive, wait for 10 - 15 minutes, and then lay the floor covering. Remove the air between the floor covering and the base plate. If possible, perform welding treatment on the joints of the floor covering.

Other Installation Key Points

  • Wall Installation: For foldable container mobile homes, first check the stability of the steel wire ropes, lift and unfold the main frame, place support rods in the middle of the container to keep it stable, and then push open the walls and tighten them with fastening screws.
  • Overall Hoisting: Hoist the installed foldable container house to the predetermined installation position and lower it after ensuring that there is no one around.