Moving Toilet Position
The toilet in the bathroom can be relocated, but the appropriate method must be chosen based on the moving distance, and construction specifications must be strictly followed to ensure smooth drainage.

For small-scale movements (10-40 cm), a toilet offset connector can be used. The specific operation involves chiseling open the floor, embedding a flat pipe, and ensuring a slope greater than 3%. The slope is a critical parameter; if insufficient, sewage may deposit due to slow flow, leading to pipe blockage. After embedding the pipe, it must be fixed with cement mortar, and the floor's flatness must be restored.
If the movement exceeds 40 cm, the floor must be raised by 12-20 cm. This method provides a slope for pipe laying by elevating the space, but it alters the overall height of the bathroom, requiring attention to height alignment with adjacent areas. After raising the floor, a new waterproof layer must be applied. Flexible waterproof coating should be used as the waterproof material, with the application height covering the raised portion and extending at least 30 cm up the wall. A closed-water test must be conducted for 48 hours to confirm no leakage before proceeding with further construction.
A wall-mounted toilet is another viable option. Its water tank is hidden inside the wall, and the sewage pipe can be laid along the wall or floor, offering high flexibility in positioning. However, it is essential to plan the installation position of the water tank in advance, as the tank's thickness occupies some space, potentially affecting the bathroom layout. Additionally, wall-mounted toilets are more challenging to repair; if a fault occurs, the wall must be dismantled for inspection, thus requiring higher pipe quality.
Regardless of the chosen method, adherence to construction specifications is paramount. Pipe connections must use specialized glue or hot-melt technology to ensure tightness; a protective layer must be laid after floor restoration to prevent pipe damage during subsequent construction; and a water flow test must be conducted after construction to check for smooth drainage and any leakage. If the bathroom has a sunken structure, the load-bearing capacity of the backfill material in the sunken area must also be considered when moving the toilet to avoid floor cracking due to pipe laying.
Relocating a toilet involves multiple steps, including pipe modification and waterproofing, and it is recommended to be carried out by professionals. Before construction, communicate with the property management to confirm whether modifications to the main drainage pipe are allowed; if structural changes involving load-bearing walls are required, relevant approval procedures must be completed in advance.