Modular Concrete Prefabricated Housing
Modular concrete prefabricated housing is a construction model that breaks down buildings into independent modules, which are prefabricated in factories and then transported to the site for assembly. It features short construction periods, controllable quality, energy efficiency, environmental protection, and easy maintenance, but requires a strong industrial base.

Core Features and Production Model
Modular concrete prefabricated housing is characterized by standardized design, factory-based production, and assembly-based construction. In factories, components such as ceilings, walls, and waterproof layers are produced independently. After individual production, scattered components are sent to the assembly station and assembled using highly automated equipment, similar to the automotive manufacturing process. For example, the annual delivery capacity of the China Construction HaiLong Intelligent Construction Industrial Park reaches 20,000 to 30,000 modules, demonstrating the advantages of large-scale production.
Advantages Over Traditional Construction Methods
- Significantly Shorter Construction Period: The construction period can be reduced by more than 60%, and the overall building cycle can be shortened by about 50%. For instance, the Guangdong Shenzhen affordable housing project used 6,028 modules to compress the completion time from 2.5-3 years to 1 year; rural housing projects can be completed in as little as 14 days.
- Precise Quality Control: Millimeter-level error control is adopted, with steel bar positioning and component accuracy meeting industrial standards, and design details are more refined.
- Outstanding Environmental Benefits: Construction waste is reduced by about 80%, and issues such as on-site noise, dust, and traffic congestion are significantly reduced.
- Convenient and Efficient Maintenance: Each module is equipped with an 'ID card' that records project name, model, production date, and other information, facilitating repair and replacement.
Development History and Policy Support
The concept originated from Thomas Edison's experiments in 1899. China began research and development after the ban on clay bricks in Beijing in 2001. In recent years, many regions have introduced policies to promote its application: Guangzhou requires that modular buildings account for no less than 15% of newly built affordable housing starting from 2026; Shenzhen plans to implement a cumulative total of 3 million square meters of projects by 2028; Beijing has issued technical standards such as the 'Technical Guidelines for Concrete Modular Buildings.' In 2023, China's first concrete modular high-rise building, 'Huazhang Xinzhu,' was completed in Shenzhen; in 2026, the Zhangzhou Nuclear Power Unit 4 completed the lifting of a 454.289-ton module using this technology; in May of the same year, the first module lifting was completed for the Beijing Haidian District Dinghuisi North Plot affordable housing project, making it the region's first concrete modular affordable housing project.
Challenges and Limitations
Modular concrete prefabricated housing requires the support of a technical system, production system, and industrial cluster, imposing high demands on the industrial base. It has not yet been fully popularized.