Mobile Toilet Production Process
Admin 10 de octubre de 2026
There are mainly two examples of the production process for mobile toilets:

First Production Process
- Water Storage Tank Processing: Use an angle grinder to split the water storage tank in half, creating two semi-tanks to serve as basic components for subsequent structural construction.
- Mobile Device Installation: Fix universal wheels at the four corners of a wooden board to make the entire toilet mobile, facilitating use in different locations.
- Height Increase: Take wooden strips and fix them to the upper side of the tank with self-tapping screws to increase the interior height of the toilet and enhance user comfort.
- Door Frame Construction: Create an entrance on the side of the water storage tank and install sponge strips on both sides of the entrance to form the basic structure of the door frame.
- Wall and Roof Construction: Insert plastic soft panels between the wooden strips to form the walls; place the upper half of the water storage tank on top of the wooden strips to serve as the roof.
- Appearance Enhancement: Paint the wooden strips with white waterproof paint to improve aesthetics and provide waterproofing.
- Simple Door Production: Use foam strips to拼接 (assemble) discarded honeycomb wooden boards to create a simple door.
- Drainage System Installation: Drill a hole at the bottom of the tank to install a drain pipe, forming a floor drain; drill a hole on the side to connect a direct joint, ensuring smooth drainage of sewage.
- Small Water Storage Device and Bath Heater Installation: Place a plastic bucket on the roof to form a small water storage device; connect a bath heater made from a water pipe to meet basic bathing needs.
- Toilet and Sink Installation: Install a three-way joint below the water inlet pipe and connect a showerhead; place the toilet and install the water tank, securing the toilet with glass glue; connect the drain pipe to the sewage tank, extend a water pipe horizontally from the three-way joint of the outlet pipe to the entrance as the sink's water inlet pipe, install joints and hoses, and drill a hole in the door to install a joint.
Second Production Process
- Mobile Device Installation: Fix universal wheels at the four corners of the bottom of a plastic pallet to make the toilet mobile.
- Water Storage Tank Processing: Place a water storage tank recovered from a garbage station on the pallet and use an angle grinder to cut along the top marking line to remove the top, forming an open tank.
- Tank Stacking and Fixing: Stack another open-top water storage tank upside down on the first tank and fix the outer frame with self-tapping screws.
- Entrance Creation: Cut a rectangular opening 180 cm high and 50 cm wide in the outer frame of the water storage tank and cut the tank accordingly to form an entrance.
- Drainage System Installation: Drill a hole in the interior floor of the water storage tank, insert an elbow from the bottom up and cut in a water pipe, seal the gaps with glue, and cut off the excess water pipe.
- Toilet Installation: Place the toilet对准 (aligned with) the drain and secure it with glue around the toilet.
- Handwashing Device Installation: Fix a water pipe on the wall clip, install a faucet, secure a pipe cap with screws below, connect a water pipe and drill a hole below as the drain pipe outlet, drill a hole in the pipe cap, apply glass glue, and fix a stainless steel basin as the handwashing basin.
- Other Facility Installation: Connect the water inlet pipe to the toilet water tank, connect the shower hose, install the shower bracket and toilet seat, and install a spray-type showerhead made from a water pipe.
- Door Installation: Bring a wooden board, fix hinges on the frame of the water storage tank, and fix the other side of the hinges to the wooden board to form the bathroom door; install a door handle on the door.