Mobile Toilet Procurement Process
The mobile toilet procurement process includes seven key stages: defining requirements, verifying supplier qualifications, confirming the plan, production scheduling, logistics delivery, installation and acceptance, and post-sales service. Details are as follows:

I. Defining Requirements and Scenario Adaptation
Determine the equipment type based on the usage scenario (construction sites, exhibitions, scenic spots): For construction sites, choose durable models equipped with independent fecal storage tanks (capacity ≥ 150L) and anti-corrosion frames; for exhibitions, select lightweight models that support modular rapid assembly; for scenic spots, opt for eco-friendly models that integrate water-saving flushing systems (single flush volume of 0.8L) and solar power modules. Calculate the quantity based on the number of users and the duration of use. For example, for an event with 1,000 people, it is recommended to allocate one standard unit per 80-100 people, with a 20% reserve.
II. Verifying Supplier Qualifications
Confirm that the supplier has the relevant business scope for producing environmental protection equipment or leasing sanitation facilities, and provide performance proofs of similar projects in the past two years (≥3 supply cases of over 100 units). Check whether the products have passed high- and low-temperature cycle tests (-20°C to 40°C), 1,000 door opening and closing tests, and transportation vibration simulation tests, with a failure rate of ≤2% per year. Prioritize suppliers with local warehouses and require them to provide a 7×24-hour response mechanism, a spare parts inventory (≥10% of the total equipment quantity), and a regular maintenance plan.
III. Plan Confirmation and Contract Signing
The supplier provides a detailed quotation plan based on the on-site survey results, including product specifications, quantity, total price, service content (transportation, installation, cleaning, maintenance), leasing/purchasing method, payment terms, and the responsibilities of both parties. The contract must specify the equipment configuration details, such as the construction site model requiring anti-slip and wear-resistant floor tiles and a fecal extraction port, the exhibition model including a foldable storage rack, and the scenic spot model mandatorily equipped with barrier-free toilet stalls.
IV. Production Scheduling and Factory Preparation
The supplier schedules inventory or arranges production according to the order. Standard products are directly inspected and shipped, while customized products are produced as required. All products leaving the factory must pass structural integrity, functional, and cleaning and disinfection re-inspections. For example, the durable construction site model must complete salt spray corrosion tests to ensure over three years of outdoor rust resistance; the eco-friendly scenic spot model must test the endurance of the solar power module.
V. Logistics Transportation and On-site Delivery
The logistics department arranges transportation vehicles based on the product quantity and on-site address, plans the optimal route, and schedules unloading times. Upon arrival, the quantity and appearance of the products are checked with the client's on-site representative to confirm no damage.
VI. On-site Installation, Commissioning, and Acceptance
A professional team uses truck-mounted cranes and other equipment to hoist the mobile toilets to the predetermined locations, performs leveling adjustments, and ensures secure connections. Models requiring water and electricity connections are safely connected by certified electricians and tested for water and electricity supply. After installation, a comprehensive functional test (flushing, lighting, ventilation, etc.) is conducted, and the interior is finally cleaned. The client is invited to fill out an acceptance form, and management personnel are trained in usage and maintenance.
VII. Post-sales Operational Support and Services
The supplier provides regular cleaning, consumable replenishment, fecal waste removal, and equipment inspection services as per the contract, maintaining a 24-hour emergency contact channel. For purchased equipment, a regular maintenance ledger must be established, with quarterly inspections of key components such as electrical circuits and flushing systems to extend the service life.