Volver al blog
Artículo

Mobile Toilet Panel House Production

Admin 21 de septiembre de 2026

There are mainly two ways to produce mobile toilet panel houses: self-production and factory customization.

Self-production Method

If you choose to independently produce a mobile toilet using a water storage tank and a pallet, the specific steps are as follows:

  • Install universal wheels: First, fix universal wheels at the four corners of the bottom of the pallet to facilitate subsequent movement.
  • Process the water storage tank: Place the water storage tank retrieved from a garbage station and use an angle grinder to cut along the marked line at the top to form an open tank. Stack two open-top water storage tanks upside down and fix the outer frame with self-tapping screws to build the main space of the toilet.
  • Create an entrance: Cut a rectangular opening on the built main body to form an entrance for easy access by people.
  • Install sanitary facilities: Drill holes in the interior floor, insert elbows and water pipes, and seal them. Install a toilet and fix it. Fix water pipes on the wall with clips and install a faucet. Connect a stainless steel basin as a sink below. Connect the water inlet pipe of the toilet tank and the shower hose. Install a toilet seat and a spray-type showerhead to meet basic sanitary needs.
  • Make and install the door: Finally, make a door with wooden boards and hinges and install a door handle to complete the production of the entire mobile toilet.

Factory Customization Method

There are manufacturers in Handan City, Hebei Province, that build and wholesale mobile toilet public restrooms. Their products have many advantages:

  • Excellent performance: They have good earthquake resistance, a solid overall structure, light weight, and uniform load distribution. They also have good thermal insulation performance, with multiple layers of panels filled with insulation materials, improving thermal insulation by 65% compared to brick-and-concrete construction methods.
  • Efficient construction: The construction period is short. Materials are prefabricated in the factory, and installation only takes about 30 days. Moreover, construction can be carried out throughout the year.
  • Reasonable price: The overall cost is low, and prices vary according to the order quantity. For orders of 100 - 199 units, the price is 900.00 yuan; for 200 - 299 units, it is 850.00 yuan; and for 300 units or more, it is 790.00 yuan. Users can choose an appropriate manufacturer for customization according to their own needs and budget.