Installation Guide for Mobile Toilets (Underneath)
No publicly available installation diagrams have been found for mobile toilets (such as integrated mobile restrooms), but the installation steps for basic mobile toilets and toilet relocation methods can be referred to in the following instructions:

I. Installation Steps for Basic Mobile Toilets
- Install Anti-Slip Pads Place silicone anti-slip pads at each of the four corners of the toilet base to ensure stable contact with the ground and prevent sliding or tipping during use.
- Assemble the Toilet Body Align the upper and lower toilet bodies and press down to secure the clips, completing the overall assembly. This step requires no tools and is simple to operate, suitable for temporary household use scenarios.
II. Toilet Relocation Methods (Applicable to Adjusting the Position of Fixed Toilets)
If you need to adjust the position of the toilet (not an integrated mobile toilet), you can choose from the following plans based on the relocation distance:
- Install a Relocation Device (Short-Distance Relocation)
- Purchase a finished relocation device (oval flat tube type, height approximately 60mm) and ensure it matches the diameter of the original toilet.
- Chisel out the floor slab 20-40mm, embed the relocation device, and connect it to the original sewage pipe, paying attention to the tightness of the connection.
- After completing floor leveling, waterproofing, and tile laying, install the toilet.
- Key Limitation: It is recommended that the relocation distance does not exceed 400mm; otherwise, a slope (≥2%) should be set to avoid blockage.
- Install a Wall-Hung Toilet (Long-Distance Relocation)
- Relay the pipeline to the wall and install a concealed cistern and matching bracket.
- Build a low wall to enclose the cistern and pipeline, ensuring structural stability and aesthetics.
- Finally, install a wall-hung or floor-standing toilet, paying attention to the wall's load-bearing capacity and horizontal alignment.
- Raise the Floor for Relocation (Bathrooms Without a Lowered Floor Structure)
- Build a base platform (height 180-200mm) using lightweight blocks, embed the sewage horizontal pipe, and reserve a maintenance opening.
- After completing floor waterproofing and tile laying, install the toilet.
- Applicable Scenarios: Suitable for bathrooms with a same-floor drainage system where slotting is not possible.
III. Installation Suggestions for Integrated Mobile Toilets
If you need to install an integrated mobile restroom (such as an eco-friendly public toilet or a temporary toilet on a construction site), it is recommended to take the following measures:
- Contact the product manufacturer to obtain detailed installation instructions and video guidance to ensure compliance with design specifications.
- Have a professional team assemble it on-site, focusing on checking the connection of the sewage pipeline, electrical wiring, and structural stability.
- After installation, conduct water and electricity tests to ensure normal functionality and no leakage risks.
Tip: The installation complexity of mobile toilets varies depending on the product type. Non-professionals are advised to refer to the instructions or seek technical support first.