Mobile Toilet Acceptance Report
The mobile toilet acceptance report typically includes procurement and project information, acceptance criteria, acceptance conclusions, and signatures of the acceptance responsible persons. Some detailed reports may also cover structural safety, hygiene indicators, and facility functionality testing.

I. Procurement and Project Information The acceptance report must clearly state that the purchasing entity is the Xixia County Urban Sanitation and Environmental Protection Center, the winning supplier is Henan Xujia Environmental Protection Technology Co., Ltd., the project name is "Mobile Environmental Protection Public Toilet," and the project number is 2023-46. The core content involves the procurement of three mobile toilets with the specifications of "2 squatting positions + 1 management room + 1 third toilet," dimensions of 650022003000 millimeters, and a total contract amount of 405,000 yuan. This section must be fully consistent with the procurement contract to ensure project legality and financial transparency.
II. Acceptance Criteria Acceptance must strictly adhere to the contract terms, focusing on verifying two key aspects:
- Quantity and Specification Matching: The actual delivered quantity, model, and dimensions of the mobile toilets must be fully consistent with the contract terms, with no additions, deletions, or specification deviations.
- Quality and Appearance Requirements: The product appearance must be intact without damage, with a flat surface, uniform color, and no scratches, deformations, or other defects. Performance must meet design standards, such as structural stability, corrosion-resistant materials, and good sealing to ensure no quality issues affect usage.
III. Acceptance Conclusion After on-site verification, the quantity and specifications of the three mobile toilets are fully consistent with the contract, with no damage or missing parts found, meeting the acceptance criteria requirements. The conclusion can be determined as "Acceptance Passed." This conclusion must be based on objective evidence, such as on-site measurement records and photographs, to ensure traceability.
IV. Signatures of Acceptance Responsible Persons The acceptance report must be signed and confirmed by the acceptance responsible persons, Li Wei and Jin Xinyu, indicating that the acceptance process is compliant and the results are authentic and valid. The signatories are typically representatives of the purchasing party or third-party supervisors and must possess relevant qualifications or authorization.
V. Extended Testing Content (Optional) Some detailed acceptance reports may include:
- Structural Safety Testing: Through material strength testing, earthquake and wind resistance simulations, and overall stability assessments to ensure the mobile toilets can withstand extreme weather or external impacts.
- Hygiene Indicator Testing: Testing air quality (e.g., ammonia and hydrogen sulfide concentrations), microbial indicators (e.g., E. coli counts), and cleanliness of high-frequency contact areas (e.g., door handles, flush buttons) to safeguard public health and safety.
- Facility Functionality Testing: Verifying the stability of the flushing system's water pressure, water-saving efficiency (e.g., single flush volume ≤ 4 liters), sewage pipe patency, lighting brightness (≥ 200 lux), ventilation effectiveness (air exchange rate ≥ 6 times per hour), and compliance of barrier-free facilities (e.g., ramp slope ≤ 1:12).
Such tests typically require reports from professional institutions as supplementary evidence for acceptance, ensuring the long-term stable operation of the mobile toilets.




