Mobile Toilet Acceptance Project

Admin 23 de septiembre de 2026

The mobile toilet acceptance project mainly includes the following aspects:

I. Acceptance Based on Six Types of Actions Simulate six scenarios: entry, use, cleaning, replenishment, maintenance, and relocation to verify the full-process functional adaptability of the mobile toilet. For example, test equipment interoperability through actual use, check the rationality of easy-to-clean designs during cleaning, and evaluate the convenience of structural assembly and disassembly during relocation.

II. Structural Safety Inspection Combine visual inspection with mechanical testing. Visually inspect the overall structural stability, observing for any tilting, cracks, or deformations, and use a level and rangefinder to measure verticality. Mechanical testing involves verifying the floor's load-bearing capacity with pressure equipment to ensure compliance with design standards.

III. Internal Equipment Inspection Conduct both appearance and functional inspections of equipment such as toilets, urinals, and sinks. Visually inspect for damage or cracks on equipment surfaces, and perform functional tests through actual drainage operations to verify smooth flow and prevent blockage hazards.

IV. Water Supply and Drainage System Inspection Test the water supply system's pipeline pressure with a pressure gauge to ensure it is within the normal range. For the drainage system, conduct a water discharge test to check pipeline smoothness, focusing on identifying interface leaks or drainage issues.

V. Electrical System Inspection Use a voltmeter and ammeter to measure the working voltage and current of lighting, ventilation, and heating devices to ensure compliance with safety standards. Functional tests should verify lighting brightness, ventilation efficiency, and the response speed of heating devices.

VI. Environmental Protection System Inspection Test the water-saving rate of water-saving devices through actual water consumption measurements. Evaluate the odor removal effectiveness of deodorization devices using an odor detector to ensure environmental protection indicators are met.

VII. Hygiene Inspection Visually inspect the cleanliness of floors, walls, and equipment surfaces. Conduct bacterial testing by sampling and culturing to analyze microbial content, providing dual verification of hygiene standards.

VIII. Room-by-Room Recording and Verification Record in detail the number, dimensions, doors and windows, sanitary ware, floors, signage, and accompanying items of each toilet. Retain original records and note the verifier and backfill time to ensure information traceability.

IX. Risk Boundary Inspection Prohibit the use of fragrances to mask ventilation or drainage issues. Electrical and lifting operations must be handled by professionals. Maintain the original state until abnormalities are located to avoid destroying the first scene.

X. Unknown Item Management Clarify key information such as location, service population, and interface conditions during handover. New requests should be recorded separately and retain version numbers to ensure clear responsibility boundaries.

XI. Re-inspection and Recording After rectification, conduct a re-inspection following the original process. Hand over keys, spare parts, and instruction documents. For items that fail, clearly define the impact scope, temporary measures, responsible persons, and re-inspection dates to ensure closed-loop management.