Installation of Mobile Toilets in Maoming Park
The installation process of mobile toilets in Maoming Park typically includes six steps: preliminary preparation, foundation fixing, main structure installation, internal facility connection, functional debugging and inspection, and auxiliary facility assembly, as detailed below:

1. Preliminary Preparation
Select a flat, well-ventilated site away from water source pollution areas, clear debris, and confirm the installation location. Suppliers (such as Zhanjiang Yuncheng Steel Structure Engineering Co., Ltd.) can provide free on-site measurement services to customize toilet dimensions according to park requirements, ensuring harmony with the surrounding environment.
2. Foundation Fixing
Place the prefabricated steel structure chassis (welded from channel steel or I-beams) steadily at the predetermined location, and secure the bottom with expansion screws or counterweights to prevent shaking. For split-type toilets, adjust the chassis to a level state using a spirit level to ensure subsequent installation stability.
3. Main Structure Installation
- Walls and Roof Panels: Use materials such as color-coated steel sheets, metal carved panels, or aluminum-plastic panels, insert them sequentially into the chassis slots, and secure them with bolts or clips; seal the roof panels after installation to prevent rainwater leakage.
- Integrated Toilets: If it is a box-type structure, the factory has completed interior decoration and equipment integration, and only needs to be hoisted into place and connected to water and electricity on-site, significantly improving installation efficiency.
4. Internal Facility Connection
Install toilets, flushing systems, sinks (optional), lighting, and ventilation equipment. The connection of water and electricity pipelines adopts a modular quick-connector design, which can shorten construction time but must be operated by professionals to ensure safety. If connection to the municipal sewage network is required, additional pipelines need to be laid, extending the installation time accordingly.
5. Functional Debugging and Inspection
Conduct flushing tests, circuit inspections, and leak-proof tests to ensure no blockages, water leakage, or electric leakage. Suppliers (such as Yuncheng Company) will provide installation guidance and train park management personnel on equipment operation to ensure efficient later maintenance.
6. Auxiliary Facility Assembly
Install doors, windows, handrails, hooks, and other accessories, lay anti-slip mats, and place toilet paper, deodorizers, and other items to enhance user comfort.
Precautions
- Installation efficiency is affected by toilet type: Integrated toilets take about 2-4 hours to install, while split-type toilets take longer.
- Supplier selection: It is recommended to choose companies that provide one-stop services for design, production, and construction (such as Yuncheng Company) to meet custom requirements of the park.
- Price reference: The prices of mobile toilets in the Maoming area vary depending on type and configuration, ranging from 283 yuan per unit to 3,000 yuan per unit. Some suppliers support leasing services.