The installation of intelligent mobile toilets in Lvliang should follow the following construction plan and key points:

I. Construction Preparation
- Technical Preparation: Organize technical personnel to familiarize themselves with construction drawings, prepare special construction plans and technical disclosure documents, and train construction personnel on installation processes to ensure standardized operations.
- Material Procurement: Select materials that meet standards, including steel (channel steel, I-beams, square steel), wall materials (color-coated steel plates, metal carved panels, stainless steel), sanitary ware (ceramic squat toilets, intelligent flushing devices), electrical equipment (LED lights, exhaust fans, leakage protection devices), etc. Materials should have waterproof and corrosion-resistant properties, especially suitable for scenic spots or construction sites.
- Equipment and Site Preparation: Equip with lifting equipment, welding equipment, electric drills, and other construction machinery. Clear the site and set up temporary facilities to ensure a safe and orderly construction environment.
II. Foundation Construction
- Setting Out and Pouring: Set out the foundation according to the dimensions of the mobile toilet. Pour the foundation with concrete, with a thickness of ≥200mm and a strength grade of ≥C20.
- Curing Requirements: The foundation should be cured for at least 7 days after pouring to ensure that the concrete strength meets the standard and provides stable support for the subsequent main structure.
III. Main Structure Installation
- Bottom Frame: Weld a rectangular frame using channel steel or I-beams and fix it to the foundation with expansion bolts or welding methods to ensure levelness and stability.
- Columns and Top Frame: Vertically weld square steel columns at the four corners of the bottom frame. Weld the top frame to the columns to form an overall structure. Check the welding quality to avoid false welding or missed welding.
IV. Intelligent Device Integration
- Flushing System: Choose intelligent flushing, manual flushing, or waterless packaging methods according to needs. When embedding water and electricity lines, comply with waterproof specifications to avoid line aging or short circuits.
- Electrical Installation: Connect LED lights, exhaust fans, and leakage protection devices to ensure electrical safety. Lines should be protected by pipes to avoid direct exposure.
- Intelligent Control: If equipped with automatic sensing, remote monitoring, and other functions, connect the lines and debug them according to the instructions to ensure that the system responds sensitively and data transmission is stable.
V. Acceptance and Maintenance
- Acceptance Standards: Check the structural stability, equipment operation, and sealing performance to ensure that the wind resistance (10-level) and earthquake resistance (8-degree) capabilities meet the standards, with no leakage or abnormal noise.
- Daily Maintenance: Regularly clean the toilet bowls and check the intelligent system to avoid the accumulation of dirt affecting functionality. At the same time, check the electrical lines to prevent safety hazards.
Notes: If temporary use is required, rental services can be selected; for long-term use, it is recommended to contact the manufacturer for customized installation to ensure the adaptability of materials and functions.