The installation of mobile public toilets in Linxia must adhere to scientific procedures and regulatory requirements, covering key aspects such as foundation treatment, modular assembly, pipe connection, and equipment commissioning. The specific points are as follows:

1. Foundation Treatment and Leveling
The installation of mobile toilets requires a stable foundation. Conventional installation requires compaction testing of the foundation to ensure uniform ground bearing capacity and prevent structural damage due to uneven settlement in the later stages. For modular mobile toilets, the foundation requirements are more flexible, eliminating the need for concrete pouring. Simply leveling the ground allows deployment on terrain with a slope of less than 5 degrees. This design significantly reduces construction difficulty, making it particularly suitable for complex terrains or temporary use scenarios.

2. Modular Assembly Process
The installation of modular mobile toilets follows a 'bottom-up' sequence:

  • Steel Chassis Positioning: As the foundational support structure, precise adjustment of the horizontal level is required to ensure overall stability.
  • Column and Skeleton Installation: Install vertical columns, horizontal support beams, and floor skeletons sequentially to form a frame structure.
  • Wall Panel and Roof Module Installation: Wall panels are fixed to the skeleton using clips or bolts. After covering with roof modules, check for airtightness to prevent rainwater leakage.
    Modular design standardizes the installation process, allowing a single toilet to be ready for use in as little as 90 minutes from arrival on-site, greatly enhancing deployment efficiency.

3. Pipe Connection and Sealing
Pipe connections must balance functionality and durability:

  • Sealing Requirements: All pipe interfaces must be tightly sealed to prevent sewage or odor leakage. Modular toilets use quick-connect fittings with built-in rubber seals, which can be sealed by rotating 90 degrees, offering simple operation and high reliability.
  • Insulation Measures: In regions with significant temperature variations, exposed pipes require insulation layers to prevent freezing and cracking in winter, ensuring normal use.

4. Equipment Commissioning and Acceptance
After installation, comprehensive commissioning is required:

  • Ventilation and Lighting Systems: Check if the ventilation device effectively removes odors and if the lighting system illuminates steadily. The ventilation pipes of modular toilets are connected to wall panel预留孔 (reserved holes) via hoses and secured with stainless steel clamps to ensure airtightness.
  • Functional Testing: Core functions such as flushing and sewage discharge must be tested by simulating actual usage scenarios to verify equipment operation.

5. Installation Team and Qualification Requirements
The installation of mobile toilets involves lifting operations and electrical wiring, requiring professional teams with special equipment operation qualifications to ensure construction safety and compliance.

Through the above process, mobile public toilets in Linxia can achieve efficient, safe, and environmentally friendly deployment, meeting sanitation needs in public areas.