The installation of container houses in Linxia requires selecting the installation method according to the specific type. Generally, it can be quickly completed by a professional team, and the installation of some foldable container houses takes only about 3 minutes. Here are the details:

Installation of Ordinary Container Houses

There are professional manufacturers of container mobile homes in Linxia, such as De'en Container Mobile Home Co., Ltd. These manufacturers have professional installation teams and use modular container designs for installation. The modular design enables quick and reusable installation. There is strict management in the production process, with 5-time sampling and multi-level quality control. During installation, the professional team will build according to the design plan, with flexible construction that allows for the addition or reduction of the number of rooms at any time. After installation, a dedicated person will conduct debugging to ensure that the container house can be used immediately after hoisting. At the same time, they will also explain relevant product maintenance knowledge to customers. For example, the installation of container houses in places such as construction site dormitories and project department offices is carried out by professional teams following standardized procedures to ensure installation quality and efficiency.

Installation of Foldable Container Houses

The installation of foldable container mobile homes is more convenient. Taking Tengfei's third-generation foldable container mobile home as an example, non-installation personnel should stay away from the installation area during installation. The specific steps are as follows:

  • Step 1: Check the stability of the steel wire ropes, hoist the main frame, and place support rods in the middle of the container body to keep it stable after it is smoothly unfolded.
  • Step 2: Push open one wall and tighten it with fastening screws. Then push open the other wall with doors and windows and also tighten it with fastening screws.
  • Step 3: Hoist the foldable container house to the predetermined installation location, ensure that there is no one around, and then lower it. Under the operation of professional installation personnel, the installation of one foldable container house can be completed in about 3 minutes.

Installation of Container Houses in Special Scenarios

During the post-earthquake reconstruction transition period in Linxia, Gansu, a large number of container houses were deployed by relevant departments. These container houses were installed by professionals, such as the staff from China Construction Eighth Engineering Division. The container houses are 6 meters long, 3 meters wide, and about 2.6 meters high, with doors and windows. When hoisted to the ground, electrical wires, telephone lines, and other facilities have been pre-buried in the container bodies. After installing sanitary facilities and electrical appliances, the people can move in their furniture and use the houses. The installation process is efficient and orderly, providing timely living places for the affected people.