Light Steel Prefabricated House Roof Truss Method

Admin 18 de septiembre de 2026

The construction method of the roof truss for light steel prefabricated houses mainly includes four key aspects: roof truss form and material selection, structural composition design, construction process and process control, and roof layer construction.

Roof Truss Form and Material Selection: The truss shapes of light steel roof trusses are diverse, with common forms including trapezoidal, triangular, and spindle-shaped, which can be selected based on architectural requirements and mechanical properties. In terms of materials, components are mostly made of angle steel, thin-walled steel sections, round tubes, or square tubes. These materials are lightweight, high-strength, and corrosion-resistant, making them suitable for industrial prefabrication. For example, triangular roof trusses are suitable for small-span buildings, while trapezoidal roof trusses are more suitable for large-span spaces, with the specific form determined by load calculations.

Structural Composition Design: The roof structure is composed of components such as roof trusses, support systems, rafters, and ridge beams working together. The support system is crucial, including top chord supports, bottom chord supports, and vertical supports, which are used to enhance the overall stability of the roof truss and prevent lateral deformation. For example, top chord supports can disperse wind loads, bottom chord supports bear vertical loads, and vertical supports connect the top and bottom chords to form a spatial stiffness system.

Construction Process and Process Control:

  1. Material Preparation and Marking: Before processing, the color of the framework should be clarified, and each material should be marked with its length, project name, and usage location. Local color spraying can be used for differentiation to avoid confusion.
  2. Site Selection: The assembly site should be a hardened concrete floor or a specially treated floor with an area larger than the maximum roof truss size and a flatness error controlled within ±2mm to ensure assembly accuracy.
  3. Assembly Baseline Fixing: Use long members as the baseline and short members as limit stops, with the member openings facing upwards. After straightening, fix them to the ground with screws to prevent displacement during assembly.
  4. Framework Positioning and Assembly: First, install the top and bottom chord members (with the openings facing downwards), then connect the light steel keels with bolts or welding to form a load-bearing framework. Key parts, such as the ridge and eaves nodes, need to be reinforced, and pipeline holes should be reserved to avoid damaging the structure during later excavation.

Roof Layer Construction:

  1. Base Layer Treatment: Cover with OSB panels or multi-layer plywood to enhance the overall stiffness of the roof truss and provide a flat base for the subsequent waterproof layer.
  2. Waterproof and Insulation Layer: Lay waterproof membranes or apply waterproof coatings, with enhanced treatment required for eaves, gutters, and other parts. Some designs fill glass fiber wool between the OSB panels and the waterproof layer to improve thermal insulation performance and reduce energy consumption.
  3. Roof Tile Laying: For traditional tiles, first fix the tile battens, then lay asphalt shingles, color steel tiles, etc. For dry-hanging tiles, fix the tiles directly to the base plywood with self-tapping screws, ensuring tight overlapping. The ridge should be sealed with a cover plate to prevent water penetration.