Volver al blog
Artículo

Jianping Prefabricated House

Admin 17 de septiembre de 2026

Information about Jianping prefabricated houses mainly includes three aspects: the cement prefabricated house model, the situation of prefabricated slabs, and the reinforcement project for prefabricated floor slabs in schools in Jianping County.

Cement Prefabricated House Model: This is an industrialized house-building method. The main structural components of the house are standardized and poured in a workshop, then transported to the site and precisely assembled using a crane. The main structure of a villa can be completed in just 4 hours. Its construction cost is low, only one-third of that of traditional self-built houses, and it incorporates modern home technologies such as photovoltaic power generation and intelligent temperature control, enhancing the quality of living. This model achieves industrialized production and rapid on-site assembly, significantly shortening the construction cycle, reducing costs, and improving the intelligence and environmental friendliness of the house through modern technology.

Situation of Prefabricated Slabs: Over the past two decades, building houses with prefabricated slabs has been relatively popular due to the ability to place furniture and other items on them, the convenience of adding floors, and the ability to increase space utilization and save costs. However, prefabricated slabs have numerous drawbacks. They are hollow, with the middle part not bearing weight, resulting in poor integrity. They are also assembled by splicing, which is prone to cracks and water leakage over time, and their sound insulation is poor. Due to these drawbacks, they are difficult to use in kitchens and bathrooms and cannot have holes cut in them. Moreover, their load-bearing capacity is weak, making them unsuitable for heavy ceiling installations and the reconstruction of partition walls.

Reinforcement Project for Prefabricated Floor Slabs in 5 Schools in Jianping County: This project has been filed by Jianping County, Chaoyang City, Liaoning Province, and approved for construction under Jianping Development and Reform Bureau documents [2023] No. 160 and [2024] No. 165. The tenderer is the Jianping County Education Bureau, with funding from the government and a 100% contribution ratio. The project is ready for tendering and is open for bidding. The construction site is within Jianping County, with a project scale of reinforcement work, a frame structure, and a building area of 10,575 square meters. The planned construction period is from October 20, 2024, to November 30, 2024.