Jiangsu Container House Installation
The installation of container houses in Jiangsu requires the integration of design, production, transportation, on-site construction, and acceptance inspection. Selecting qualified and experienced enterprises is crucial. The following provides an in-depth explanation from three aspects: installation process, enterprise selection, and technical key points.

Installation Process
The installation of container houses generally consists of two stages: factory prefabrication and on-site assembly. In the factory prefabrication stage, tasks include welding the main structure, interior decoration (such as kitchen and bathroom layout, electrical wiring), thermal insulation and fire prevention treatment (filling with rock wool or glass wool boards), and anti-corrosion coating (epoxy zinc-rich primer + topcoat). For example, China Construction Steel Structure Jiangsu Co., Ltd. breaks down buildings into independent modules and completes over 80% of the processes in the workshop. After the modules are transported to the site in container form, they only need to be assembled and connected to water and electricity for immediate use, significantly shortening the construction period. In the on-site assembly stage, adjustments to the foundation are made according to the terrain and climatic conditions (such as strengthening moisture-proof treatment in high-humidity areas). Modules are quickly hoisted through standardized interfaces, and the assembly accuracy must meet the requirements of the Code for Design of Steel Structures (GB50017).
Enterprise Selection
Container house installation enterprises in Jiangsu need to possess design capabilities, production qualifications, and after-sales support. For example, Suzhou Zhongnan Steel Structure Co., Ltd. has a factory area of over 10,000 square meters and 15 years of process experience. It can customize container house styles according to needs and is equipped with a 24-hour online after-sales team. Changzhou Dongyao Construction Engineering relies on intelligent production lines to provide integrated support from design to delivery, with product load-bearing performance and fire resistance ratings meeting the GB/T 8624-2012 standard. Nanjing Changyou Intelligent Manufacturing solves leakage problems through top-bottom integrated welding structures and built-in drainage systems. Its packaged container houses adopt a flattened transportation structure to reduce logistics costs.
Technical Key Points
During the installation process, attention should be focused on structural stability, thermal insulation performance, and fire safety. In terms of structure, the framework should use Q235 light steel structures, with steel plate thickness and load-bearing capacity customized according to requirements. For thermal insulation, wall panels should be selected from 50mm or 75mm rock wool boards to balance energy efficiency and sound insulation. For fire prevention, the fire resistance limit should be enhanced through thickened fire-resistant rock wool and tin foil wrapping processes. In addition, the installation site should implement 5S-level production safety standards to ensure that the construction process meets the requirements of the Code for Load on Building Structures (GB50009).