Hunan Container House Fire Station
The first container house fire station in Hunan, which adopts an integrated construction approach combining 'prefabricated modularization and smart systems,' is represented by Yinqiao Fire Rescue Station. Located in the Hunan Xiangjiang New Area, it was officially inaugurated and put into operation on February 5, 2024.

I. Prefabricated Modular Construction Model
Yinqiao Fire Rescue Station employs a concrete-steel joint prefabricated hybrid frame structural system. Through a 'modular procurement of goods' mechanism, it integrates prefabricated buildings, emergency equipment, and intelligent fire prevention and control systems, enabling 'one-time procurement and ready-to-use occupancy.' This model reduces the construction period from the traditional 24 months to just 6 months, lowering overall construction costs by 5% to 10%. It effectively addresses the challenges of site selection difficulties, cumbersome approval processes, and long construction periods associated with traditional fire stations. Prefabricated modular construction, with its factory-prefabricated components and rapid on-site assembly, reduces the complexity and uncertainty of on-site construction, enhancing construction efficiency and quality.
II. Application of Smart Fire Protection Systems
The station is equipped with a smart fire protection system that leverages IoT, big data, and 3D modeling technologies to achieve dynamic perception and intelligent dispatching of personnel, vehicles, and equipment. This system is interconnected with the municipal smart fire protection platform, establishing a modern command system that coordinates 'people-buildings-machines-intelligence,' improving the efficiency and precision of fire emergency responses. The application of the smart fire protection system enables the fire station to monitor the status of various resources in real-time, quickly allocate resources, and provide strong support for firefighting and rescue operations.
III. Construction of Fire Protection Education Areas
Yinqiao Fire Rescue Station has also created a fire protection education area that meets the standards of a municipal-level science education base. It features three main sections: an introduction hall, a main exhibition area, and a special experience zone, equipped with VR virtual escape simulations, AI virtual firefighting, a 7D cinema, and other special projects for practical training in fire prevention and escape skills for the public. This initiative enhances public awareness of fire safety and self-rescue capabilities, promoting the dissemination and popularization of fire protection knowledge.
IV. Construction Significance and Impact
The construction and operation of Yinqiao Fire Rescue Station represent a vivid practice of Hunan's efforts to deeply integrate intelligent construction with the fire protection technology industry. It marks the successful implementation of a new fire infrastructure mechanism characterized by 'government-led procurement, team-led utilization, and separation of procurement and construction,' providing a replicable Xiangjiang model for the rapid construction of fire stations.




