Homestay Prefabricated House Installation Guide
Admin 18 de septiembre de 2026
The installation guide for homestay prefabricated houses varies depending on the type. Common types include hexagonal quick-assembly wooden houses and cement prefabricated houses. Here are the specific installation steps:

Hexagonal Quick-Assembly Wooden House Installation Guide
- Prefabricated Steel Frame Construction: Place the prefabricated steel frame directly on the pre-selected ground position or on stone piers to ensure a stable placement, providing a solid foundation framework for subsequent installations.
- Quick Assembly of Floor Modules: Assemble the floor modules according to the design requirements, using screws to reinforce the connections between modules, ensuring the floor's firmness and flatness to provide stable ground support for human activities.
- Assembly of Wall Modules: Wall modules usually come with detailed assembly instructions. Follow these instructions to assemble the wall modules one by one, paying attention to the splicing and connection methods between modules to ensure the stability of the wall structure.
- Installation of Wall Corners: After assembling the walls, install wall corners. Corners protect the walls and also enhance the aesthetic appeal of the house.
- Installation of Roof Modules: Install the roof modules on top of the walls, ensuring proper waterproofing at the overlapping positions to prevent rainwater from leaking into the house, affecting its service life and living comfort.
- Installation of Doors and Windows, and Painting: Finally, install the doors and windows, ensuring smooth opening and closing. Then, proceed with painting to add beauty and protection to the house.
Cement Prefabricated House Installation Guide
- Preparation Stage: Carefully inspect the dimensions, specifications, and strength of the prefabricated components to ensure they meet the design requirements. Confirm that the reserved sleeves and reinforcing bars match the drawings. At the same time, prepare the necessary tools and materials for installation, such as cement mortar and lifting equipment.
- Foundation Treatment: Pour a concrete foundation or strip foundation, ensuring flatness and strength during the pouring process. After pouring, measure and adjust the dimensions and elevations to ensure installation accuracy meets the requirements.
- Component Lifting and Connection: Position and assemble components such as columns, beams, and slabs in a specific order, using bolt connections or sleeve grouting to enhance the firmness between components. When filling wall gaps, use sealing materials for anti-leakage treatment to ensure the house's airtightness.
- Final Work: Clean up excess materials and debris, keeping the house's exterior clean and aesthetically pleasing. After inspection and confirmation, the house can be put into use.