Currently, publicly available information does not directly cover the specific process of mobile toilet construction in Hechuan, but reasonable speculation and analysis can be made by combining procurement projects and technical foundations.

I. Construction Background and Project Basis
The 2025 Bayu Hemei Rural Project in Wanqiao Village, Tongxi Town, Hechuan District includes the procurement of mobile toilets. The winning bidder is Chongqing Nanzi Construction Engineering Co., Ltd., with a bid amount of 582,258.76 yuan and an evaluation date of October 31, 2025. This project indicates that mobile toilet construction should be centered around the procurement contract, clarifying the supplier's responsibilities and construction scope. Additionally, mobile toilet manufacturers in Hechuan District, such as Sichuan Xinjiangzhu Integrated Housing Co., Ltd., employ modular integration technology, involving standardized design and assembly of independent functional units such as sewage treatment, structural frameworks, and internal facilities. This provides a technical foundation for construction, suggesting that construction may revolve around the on-site assembly and system commissioning of modular units.
II. Possible Construction Process and Technical Points
- Foundation Preparation: Based on the modular characteristics of mobile toilets, the site must be leveled and a concrete foundation poured before construction to ensure the ground bearing capacity meets requirements. Additionally, provisions should be made for sewage pipe connections and power line positions.
- Module Assembly: Independent functional modules (such as structural frameworks, sewage treatment units, and internal facilities) that have been manufactured are transported to the site. The main structure is assembled using bolt connections or welding, with a focus on ensuring the sealing and stability between modules.
- System Commissioning: Connect sewage pipes, ventilation systems, and water and electricity lines. Test the sewage treatment efficiency (such as the decomposition capacity of septic tanks), ventilation effectiveness (such as air exchange frequency), and the stability of water and electricity supply to ensure compliance with environmental protection and usage standards.
- Acceptance and Delivery: The purchaser (the Economic Cooperative of Wanqiao Village, Tongxi Town, Hechuan District, Chongqing) or the agency (Chongqing Shirong Engineering Supervision Co., Ltd.) conducts acceptance based on contract terms, focusing on checking functional completeness, safety, and environmental protection indicators.
III. Suggestions for Information Acquisition
For further details on the construction plan (such as modular technical parameters and on-site management specifications), it is recommended to directly contact the purchaser (phone: 17318207665) or the agency (phone: 17782057646) to obtain authoritative technical documents or on-site guidance.