The installation of mobile toilets in Hebei should follow the following steps and key points:

1. Site Assessment and Preparation Before Installation
Conduct an on-site inspection of the site, focusing on checking the ground flatness, aisle width, and water and electricity access conditions. If the ground is soft soil, it should be hardened in advance or covered with a gravel bed to ensure a stable foundation. At the same time, reserve space for equipment transportation and lifting to avoid affecting construction efficiency due to insufficient space.

2. Lifting and Fixing of the Main Structure
Mobile toilets adopt factory-prefabricated modular structures and are lifted on-site using lifting equipment. During lifting, a level should be used to calibrate the posture of the box to ensure horizontal alignment in all directions. The fixing method is selected according to site conditions: pre-embedded parts are welded for concrete foundations, and expansion bolts are used for hardened ground. Waterproof sealing strips should be added at the connections between boxes to prevent rainwater leakage.

3. Installation of the Water Supply and Drainage System
Water supply pipes should be selected based on local water temperatures, using insulated pipes buried below the frost line, and filters should be installed to prevent blockage by impurities. Drainage pipes should be laid according to slope requirements and connected to septic tanks or municipal sewage networks. In cold regions, insulation materials should be wrapped and drainage slopes should be set to prevent freezing in winter.

4. Configuration of Electrical and Ventilation Systems
Waterproof cables should be used for circuits, with switches and sockets meeting splash-proof ratings. Low-voltage LED lighting should be preferred. The ventilation system should determine the number of air changes based on the number of users, with louvered windows or exhaust fans installed on the side walls. Wiring should be insulated and reliably grounded to ensure electrical safety.

5. Installation and Debugging of Internal Facilities
The installation of toilet fixtures should accurately locate the drainage outlets, and flexible sealing materials should be used at the connections between toilets and pipes. After fixing the washbasin, adjust the level of the support and conduct a water flow test. Supporting facilities such as storage racks and handrails should be installed, and all hardware should be rust-proofed.

6. Inspection and Maintenance After Installation
After installation is completed, the sensitivity of the flushing device, pipe pressure, circuit insulation resistance, and the operation of the ventilation equipment should be tested. Establish a regular maintenance plan, including pipe freeze prevention checks, replacement of sealing strips, and anti-corrosion treatment of metal components.

7. Adaptability Treatment for Special Environments
In Hebei, climate characteristics should be considered: during winter installation, the depth of pipe burial should be increased; in windy areas, windbreak cables should be installed; and during the rainy season, temporary rain shelters should be prepared to prevent equipment from getting wet.

8. Safety Measures During Installation
Set up warning areas for lifting operations, and operators should be certified. For high-altitude work, safety belts and protective nets should be used in accordance with regulations. Electrical installation should follow the principle of separating strong and weak currents, with cables protected by flame-retardant pipes. Fire-fighting equipment should be provided on-site, and warning signs should be set up in dangerous areas.