For the assembly of container houses in Fenggang, the following two installation approaches can be referred to for operation:

Approach 1: Installation Steps for Assembled Container Houses
- Determine the Site and Foundation: Select an appropriate site, ensuring the ground is level. Carry out foundation construction, such as laying the groundwork and installing water and electricity pipelines, to provide stable support for subsequent assembly.
- Prepare Containers and Materials: Choose new or used containers according to requirements, and purchase building materials such as partition walls, doors, windows, and insulation materials, ensuring the quality of materials meets standards.
- Assemble the Container Frame: Piece together containers according to design drawings to form single or multi-story structures. Ensure the bottom is level during assembly, connect adjacent containers with steel plates, and calibrate any deviations between the central axis and the drawings.
- Install Doors, Windows, and Partition Walls: Arrange partition walls inside the containers, install doors, windows, and other facilities, and select materials such as floors and partitions according to actual needs to ensure functionality and comfort.
- Carry Out Interior Decoration: Lay floors and ceilings, apply wallpaper, and perform moisture-proof treatment. Since the raw material of containers is steel, the interior space is prone to moisture, making moisture-proof measures crucial.
- Install Water and Electricity Systems: Install water, electricity, and gas pipelines, and carry out furniture and bathroom renovations. This step requires professional electrical network design to ensure electrical safety.
- Secure the Container House: Use locking mechanisms and steel cables to enhance the stability of the house, preventing displacement or tilting due to external forces.
- Inspect and Accept: After completion, conduct a comprehensive inspection of all aspects to ensure they meet standards, test equipment functionality, and ensure the house meets usage requirements.
Approach 2: Another Installation Approach
- Determine the Site and Foundation: Select a flat, dry, and well-drained site, clear debris, and measure the site dimensions. Determine the foundation type (such as steel, concrete, or wood foundations) according to requirements, ensuring the foundation is sturdy.
- Make On-Site Adjustments: Determine the installation direction and position, use a leveling instrument to calibrate the levelness, and check the container body for any damage or defects and whether the surface is smooth to avoid subsequent issues.
- Erect Columns and Beams: Fix steel columns on the foundation according to design requirements, then install crossbeams to form the house's skeletal structure, providing support for container installation.
- Install Containers: Pre-process containers (such as cutting and reinforcement), transport them to the designated position using tools and manpower, and connect containers according to requirements to ensure structural stability.
- Install Roof and Exterior Wall Facilities: Install doors, windows, roof panels, skylights, rainwater pipes, and other facilities, focusing on overall aesthetics and practicality to enhance the house's functionality and living experience.