Engaged in the Prefabricated House Construction Process

Admin 18 de septiembre de 2026

The prefabricated house construction process mainly includes four stages: design, production, transportation, and installation.

Design Stage: This stage is the foundation of the entire construction process. It is necessary to clarify the building's function, size, and style based on user requirements, such as determining whether the house is for residential, office, or other purposes, the number of rooms, the area size, and the exterior appearance. At the same time, full consideration should be given to the standardized and modular design of prefabricated components, which helps improve production efficiency and reduce costs. Additionally, structural design for load-bearing performance and connection methods is required to ensure the stability and safety of the house, such as determining the sizes of structural components like beams and columns and the forms of connection nodes.

Production Stage: There are two main methods. One is the manufacturing process flow. According to the detailed design drawings of prefabricated components, steel molds are made. For prefabricated exterior wall panels, the reverse-forming process is used to lay tiles on the steel molds (this step is not required for other components). Then, steel bars are tied, embedded parts such as lifting lugs, steel bar connectors, and threaded sleeves are installed. Next, concrete pouring, curing, and mold removal are carried out. Finally, the tile gaps are treated, and component numbers are printed. The other is the industrial production method. The entire house is divided into independent standard modules, such as bedrooms, kitchens and bathrooms, and corridors. All processes, including steel structure main body welding, wall laying, pre-embedding of water and electricity pipelines, door and window installation, full-house fine decoration, waterproof and fireproof testing, and safety quality inspection, are completed in the factory to ensure that the modules are complete rooms with decoration, water and electricity, and supporting facilities when they leave the factory.

Transportation Stage: First, prefabricated components or finished modules are uniformly coded and classified for acceptance. Waterproof, anti-corrosion, and shockproof protections are carried out to adapt to the ocean shipping environment. Then, they are transferred to domestic ports by special flatbed trucks. The sizes are suitable for international standard shipping containers and are shipped to more than 150 countries and regions around the world, with full-process logistics traceability.

Installation Stage: After the modules arrive at the construction site, they are assembled through crane hoisting and interface connection. There is no need for wall building, plastering, or pipeline laying; only water and electricity connection is required to complete the formation. For some prefabricated houses, such as foldable houses, after all interior decorations and system integrations are completed in the factory, they can be folded and packed into containers for transportation and quickly unfolded for use on site.