The assembly drawings of container mobile houses vary depending on their structural types, with common assembly steps including base frame installation, wall installation, roof installation, and interior decoration. The following provides detailed explanations with specific examples:

I. Assembly Process of Assembled Container Houses
Taking the 'Assembly Diagram of Container Panel Houses' as an example, the assembly starts with base frame installation: connect the bottom corners of the container to the base beams on a flat ground, and initially secure them with hexagon socket bolts. After adjusting the diagonal differences of the base frame to be ≤3mm, tighten the bolts. Then, install the π-shaped secondary beams and fix them to the top of the base beams using self-tapping screws and round-head drill tail screws. Lay the floor base plates along the 6-meter direction, pre-drill holes at both ends, cut the corners according to the chalk lines, and splice them. The splicing points of the floor should align with the centerlines of the π-shaped beams and be fixed with cross-flat-head燕尾丝 (Note: '燕尾丝' may not have a direct English equivalent, here it is kept as is for context, it could be a specific type of screw in Chinese context, you may replace it with a proper English term if known), with a spacing of 300-350mm. Finally, sand the floor joints, apply PVC special floor adhesive, lay the floor covering, and expel the air. If necessary, weld the splicing points.

II. Assembly Characteristics of Foldable Container Mobile Houses
According to the 'Installation Diagram of Foldable Container Mobile Houses', the assembly requires two operators, and non-professionals should stay away from the installation area. The steps include: checking the stability of the steel wire ropes and then lifting the main frame, unfolding it steadily, and placing a support rod in the middle of the container. Push open one wall and secure it with fastening screws, then push open the other wall with doors and windows and fasten it. Lift the foldable container house to the predetermined position and lower it after confirming that there is no one around. The installation of such houses takes only about 3 minutes, but strict safety regulations must be followed.

III. Assembly Logic of Modular Container Buildings
In the case of 'China Pinhaofang', the container modules are prefabricated in the factory with wall panels, roof panels, doors, windows, and partial decorations. After being assembled into a hexahedron using mechanical slide rails and lifting equipment, they are transported to the site for overall assembly. Such buildings transfer most of the processes to the factory, with on-site open-air operations accounting for only 10% of the total construction period, significantly improving efficiency. For example, a high-rise residential project in Shenzhen consists of 5 concrete modular buildings with a height of 99.7 meters, including 2,740 sets of affordable rental housing. Its assembly process reflects the core advantages of modular buildings, namely 'factory prefabrication + on-site assembly'.