Here is the information about a 150-square-meter container house:

Price: Prices vary among different companies and regions. Hebei Mozhu Lvjian Technology Co., Ltd. offers finished container houses with a minimum order quantity of 150 square meters at a price of 117,000 yuan. Shandong Zhonghe Steel Structure Co., Ltd. provides various types of container houses, with prices as follows: homestay simple container houses at 7,600.00 yuan per unit; Zhonghe movable container houses at 5,000.00 yuan per unit; combined movable container houses at 5,350.00 yuan per unit; second-floor container houses at 7,300.00 yuan per unit; container-renovated homestays at 6,250.00 yuan per unit; simple residential container houses at 6,050.00 yuan per unit; and products from Nanjing, Jiangsu, at 5,800.00 yuan. In Linyi, Shandong, the prefabricated container house project for temporary office and accommodation is calculated at 124.00 yuan per square meter, with a total price of 18,600 yuan for 150 square meters. In Weihai, Shandong, the assembled container house is calculated at 158.00 yuan per square meter, with a total price of 23,700 yuan for 150 square meters.
Structure: It adopts a high-strength galvanized plate sgh340 frame, and the wall panels are available in materials such as rock wool, glass wool, and EPS. These materials have good thermal insulation, heat insulation, and fire resistance properties, meeting the needs of different usage scenarios.
Dimensions: The standard packing container size is 6055x2990x2896mm. By combining and splicing multiple containers, a 150-square-meter house space can be constructed.
Functions: It has a wide range of uses, suitable for residential purposes, storage, and can also serve as functional rooms, toilets, shower rooms, washrooms, etc., meeting diverse living and working needs.
Construction Period: Taking the Shuangyashan area as an example, the construction of a 150-square-meter container house from foundation work to the completion of the main structure takes only 15 - 20 days, with a relatively fast construction speed that significantly shortens the construction time.
Construction Characteristics: The foundation usually adopts a concrete independent foundation or strip foundation, saving about 40% of the concrete usage compared to the full foundation of traditional buildings. The container body undergoes basic renovation in the factory and is then transported to the site. It is lifted and assembled using hoisting equipment. Multiple containers can be cut and welded to form larger space units. On-site wet work is reduced, lowering the amount of construction waste generated and having a smaller impact on the surrounding environment.