Container House Window Sealing and Shipment

Admin 15 de septiembre de 2026

The shipment of container houses with sealed windows is usually determined based on the window type, installation method, and supplier process, generally including steps such as window frame fixation, glass installation, and adjustment and fixation. The shipment time varies among suppliers, mostly within 3-10 days. Details are as follows:

I. Window Types and Installation Methods
Container house window sealing usually adopts customized designs. Common types include aluminum alloy windows, broken-bridge aluminum windows, and steel windows. Taking the installation process of Farilelai Prefabricated Construction (Tianjin) Co., Ltd. as an example, window installation requires first fixing the window frame aluminum. Use pull rivets to fix the window frames joined at a 45-degree angle onto the composite panels, then install the glass and adjust its position, and finally fix it to the window frame aluminum with self-drilling screws. Hangzhou Zhonghao Integrated Housing Co., Ltd. has stricter requirements for the windows of glass-curtain box-type houses, requiring the use of 60-series broken-bridge aluminum frame materials and double-glazed structures (a combination of 5+12A+5) for the glass to ensure sound insulation and thermal insulation performance.

II. Shipment Time and Supplier Processes
The shipment time varies among suppliers. Hebei Yijia Integrated Housing Co., Ltd. promises to ship folding container houses within 3 days, with a total supply of 99,999 sets; Beijing Yuanhao Integrated Housing Technology Co., Ltd. can achieve shipment within 1 day for on-site residential box-type houses, with a total supply of 1,000 units; Shandong Wanqing Integrated Housing Co., Ltd. has a standard box shipment deadline of 24-hour response, but customized products may take longer. Some suppliers, such as Qingdao Jinzhida Steel Structure Engineering Co., Ltd., do not clearly indicate the shipment time and need to be confirmed through telephone negotiations.

III. Key Considerations

  1. Material and Specification Matching: The window material needs to be compatible with the structure of the container house. For example, low-alloy high-strength structural steel houses require matching steel window frames, and color-steel plate houses mostly use aluminum alloy windows.
  2. Installation Accuracy Requirements: A 15mm gap should be reserved at the connection between the window frame and the box body, and angle irons, nails, and other accessories should be used for reinforcement to avoid deformation due to transportation vibrations.
  3. After-sales Support: It is advisable to prioritize suppliers that offer a 7-day replacement guarantee and lifetime services, such as Shandong Wanqing Integrated Housing Co., Ltd., which can reduce later maintenance costs.