The installation of water pipes in container houses requires consideration of the structural characteristics of the house, adherence to standardized procedures, and attention to details in concealed works, with a focus on material selection, laying methods, routing planning, testing and acceptance, and post-installation maintenance.

1. Material Selection and Component Inspection

Prioritize the use of environmentally friendly and durable PP-R pipes or pipes that meet national standards to avoid the use of inferior materials that may lead to later leaks. Before installation, check the integrity of the water pipes and components to ensure there are no damages, cracks, or loose connections. For example, it is recommended that PP-R pipes be installed by professionals to prevent blockages or bursts caused by improper operation.

2. Laying Methods and Routing Planning

  1. Surface-mounted and Concealed Installation: Surface-mounted installation runs along ceilings and walls, which is cost-effective and easy to maintain but prone to dust accumulation and affects aesthetics. Concealed installation is buried in ceilings or floors, offering strong concealment but making maintenance more difficult. Due to the compact space in container houses, concealed installation is recommended, but maintenance access points should be reserved.
  2. Routing Principles: Follow the standard of "horizontal and vertical" routing, avoiding horizontal trenching on walls. All pipelines should be routed up to the ceiling before branching down. Water pipes should preferably run along the ceiling. Although the renovation cost is higher, leaks can be detected promptly, reducing losses. If running along the floor is necessary, enhance waterproofing and mark pipeline locations.

3. Installation Process and Key Points

  1. Positioning and Trenching: Determine the pipeline route according to the design drawings and trench the container walls or floors, ensuring the trench depth meets the requirements for pipe embedding.
  2. Fixing and Connection: Use dedicated pipe clamps to fix the water pipes, with a spacing of no more than 1 meter. Connect pipes using hot-melt or threaded methods to ensure tightness. For example, when hot-melt connecting PP-R pipes, control the temperature and time to avoid false welding.
  3. Outlet Installation: When installing water troughs or outlets, ensure consistent height and perpendicularity to the wall. Dual outlets are typically hot on the left and cold on the right. If water pipes run along the floor, install leak-proof devices at the connections.

4. Testing and Acceptance

After installation, conduct a pressure test: close the main valve, open all faucets, and observe whether the water meter moves. If the water meter remains stationary, there are no leaks; if it continues to move, check and repair the leak points. It is recommended to conduct the test for more than half an hour to ensure stability.

5. Post-installation Maintenance and Record-keeping

Draw a detailed water circuit diagram, marking pipeline routes, valve locations, and outlet information for easy future maintenance. Regularly inspect the condition of water pipes and components, paying special attention to joints and elbows, and replace aging or damaged parts promptly.