Container House Production Process
The production process of container houses mainly includes three stages: design, production, and installation. The specific steps are as follows:

Design Stage
Based on user needs and usage scenarios, complete the structural design and detailed drawings of the container house. Clarify the house's dimensions, layout, functional modules (such as doors, windows, electrical systems, water supply and drainage systems, etc.), and load-bearing structural requirements. For multi-story or combined houses, design connection nodes and waterproofing solutions to ensure overall stability and safety.
Production Stage
- Steel Processing: Cut structural steel (such as hot-dip galvanized cold-formed steel) and weld it into a frame. Focus on checking the steel thickness (usually 1.5-3 mm) of the main beams and columns, as well as the welding process, to avoid false welds or cracks. After welding, perform surface treatment (such as galvanizing or spraying anti-corrosion paint) to extend the service life.
- Wall and Roof Panel Production: Use rock wool, glass wool, or polyurethane sandwich panels filled with insulation material. The facing material can be metal panels or calcium silicate boards, providing fire resistance, thermal insulation, and sound insulation properties.
- Internal System Pre-installation: Pre-embed systems such as doors, windows, electrical wiring, and water supply and drainage pipes in the factory to reduce on-site construction time.
- Trial Assembly and Quality Inspection: Conduct trial assembly of modules before leaving the factory, check the matching degree of components, and ensure no errors before disassembly and transportation.
Installation Stage
- Foundation Treatment: Select an appropriate foundation form (such as concrete foundation or steel structure support) based on site conditions to ensure a flat ground and adequate bearing capacity.
- Module Lifting and Assembly: Use lifting equipment to lift prefabricated modules to designated positions and connect nodes through bolts or welding to form an overall structure.
- Waterproofing and Sealing Treatment: Focus on inspecting the roof, wall joints, and areas around doors and windows, using sealants or waterproof membranes to prevent leakage.
- Internal Decoration and Acceptance: Install floors, ceilings, and internal facilities, and complete the final acceptance before putting the house into use.
Precautions: During the production process, strictly control the quality of materials (such as steel anti-corrosion treatment and sandwich panel fire rating) and follow modular design principles to ensure the house can be repeatedly disassembled and reused.