Volver al blog
Artículo

Container House Process

Admin 15 de septiembre de 2026

The container house process mainly includes core steps such as steel structure frame welding, wall and roof panel prefabrication, water and electricity pipeline embedding, and on-site assembly.

1. Steel Structure Frame Welding
The foundation of a container house is the steel structure frame of a standardized shipping container. Factories use automated welding equipment to weld high-strength steel into a box structure that meets international standards (e.g., a 20-foot container can bear 25 tons, and a 40-foot container can bear 45 tons). The welding process requires strict precision control to ensure that the box dimensions have millimeter-level errors, providing a stable foundation for subsequent modifications.

2. Wall and Roof Panel Prefabrication
After the box frame is completed, the prefabrication of walls and roof panels begins. Common materials include fire-resistant sandwich panels, steel plates, and wood (bamboo) plywood, which are processed into standardized components using CNC cutting equipment. Some high-end products use concrete or tiles for local reinforcement to enhance structural durability. During prefabrication, openings for doors and windows, as well as channels for pipelines, need to be reserved to ensure the convenience of subsequent installation.

3. Water and Electricity Pipeline Embedding
During the prefabrication of walls and roof panels, water and electricity pipelines are pre-embedded in the structural layers. Factories adopt a modular design, integrating electrical circuits and water supply and drainage systems into the walls to avoid on-site wet work. The embedded pipelines must comply with building codes. For example, electrical circuits need to be wrapped in fire-resistant materials, and water supply and drainage pipes need to have inspection ports reserved to ensure convenient maintenance later.

4. On-Site Assembly and Debugging
After most of the processes are completed in the factory, the prefabricated components are transported to the site for rapid assembly. The assembly process usually includes box splicing, wall installation, door and window fixation, and internal facility debugging. Through bolt connections or welding techniques, multiple boxes can be combined into multi-story buildings or large-span spaces. After assembly, airtightness, watertightness, and load-bearing tests are required to ensure that the house meets safety standards.

5. Interior Decoration and Acceptance
The final stage involves interior decoration, including floor laying, wall decoration, and furniture installation. Decoration materials must meet environmental requirements, such as using low-formaldehyde panels and energy-saving lamps. During the acceptance process, structural stability, water and electricity functions, and fire protection facilities need to be inspected to ensure that the house meets residential or commercial standards.