Volver al blog
Artículo
Container House Partition Wall Installation
Admin 15 de septiembre de 2026
The installation of partition walls in container houses requires selecting appropriate techniques based on the type of partition wall material. Common materials include ALC lightweight partition panels, color-coated steel sheets, and wooden frame partitions inside containers. The installation processes and key points for each are as follows:

ALC Lightweight Partition Panel Installation
Installation Process
- Line Marking and Cutting: Mark the partition wall positions on the floor and ceiling according to the design drawings, and cut the panels to the appropriate size as needed.
- Fixing U-shaped Clips: Install U-shaped clips on the ceiling or beams to secure the top of the panels; install galvanized iron fixing pieces at the bottom.
- Panel Installation and Alignment: Apply special adhesive to the top and joint surfaces of the panels, hoist them to the installation position, and adjust the verticality and flatness (using a level and laser level).
- Gap Treatment: Fill the bottom gaps with mortar and the top gaps with foam, hang mesh fabric between panels for patching, and apply special repair compound.
- Slotting and Structural Columns: Cut slots for embedding conduits 14 days after installation; reserve positions for structural columns if the wall length exceeds 6 meters for subsequent unified construction.
Risk Control
- Transportation Protection: Bind the ends of the panels 600mm apart with nylon slings, lift no more than 2 tons at a time, stack no more than two layers, and place wooden sleepers at the bottom.
- Moisture Protection and Age: Protect against moisture during transportation and on-site, and prohibit the use of panels less than 28 days old.
- Drawing Deepening: Communicate with suppliers 1-2 months in advance to optimize the design of irregular panels such as corners and door jambs.
Color-Coated Steel Sheet Partition Installation
Installation Steps
- Foundation Preparation: Ensure the floor or wall surface is flat and can be fixed without gluing.
- Assembly Structure: Fix the panel body with columns and top channels, screw self-tapping screws into pre-punched holes, and complete assembly with two people.
- Functional Adaptation: Choose rock wool core material (for thermal insulation and soundproofing) or foam sandwich (for lightness) according to needs, and reserve door and window positions.
Advantages
- Efficient and Flexible: Suitable for rapid renovation of factories and offices, with a short installation cycle and low cost.
- Environmentally Friendly and Durable: The panel surface is smooth and easy to clean, with rounded edges and stable door pushing and object hanging.
Wooden Frame Partition Installation Inside Containers
Installation Key Points
- Frame Construction: Install a wooden frame inside the container as the foundation for the partition wall, and make a thermal insulation layer (such as polystyrene board).
- Door and Window Treatment: Pre-reserve door and window openings and perform sealing and waterproofing after installation.
- Decoration Connection: Ensure a smooth transition between the partition wall and the inner wall of the container to avoid gaps.
Applicable Scenarios
- Low-Cost Renovation: Suitable for renovating old containers into villas, temporary housing, etc., requiring functional zoning to be completed in conjunction with interior decoration.
Relacionados




