Container House Installation System Diagram

Admin 15 de septiembre de 2026

The installation system diagram of container houses varies depending on the type of house. Common types include assembled and foldable ones. Here are some key installation points:

Installation of Assembled Container Panel Houses

  • Bottom Frame Installation: On a flat ground or workbench, connect the bottom corners of the container to the bottom beams using hexagon socket bolts, but do not tighten them temporarily. After adjusting to ensure that the diagonal difference of the bottom frame is ≤3mm, tighten the bolts.
  • Secondary Beam Installation: Install the π-shaped secondary beams according to the positioning hole positions on the long beams. Fix them with m5.519 self-tapping screws. The top of the π-shaped secondary beams and the bottom beams should be fixed with st4.816 round-head self-drilling screws.
  • Floor Laying: Lay the floor base plates (magnesium oxide boards) along the 6-meter direction. Cut the corners of the base plates with pre-drilled holes at both ends according to the chalk lines. Mark the centerline of the π-shaped beams, start laying the floor from one end, and align the joints with the centerline of the π-shaped beams. After laying, snap chalk lines according to the marks. Fix the floor along the chalk lines with st4.2*38 cross-head flat-tail screws, with a nail spacing of 300 - 350mm. Sand the floor joints as a whole, apply PVC special floor adhesive, lay the floor covering after 10 - 15 minutes and expel the air. If possible, weld the joints of the floor covering.

Installation of Foldable Container Mobile Houses

  • Main Body Unfolding: Check the stability of the steel wire ropes, lift the main frame steadily and unfold it, and place support rods in the middle of the container to keep it stable.
  • Wall Installation: Push open one wall and tighten it with fastening screws. Then push open the other wall with doors and windows and tighten the screws.
  • Lifting and Positioning: Lift the folded container house to the predetermined installation position and lower it after ensuring that there is no one around.

Installation Precautions

  • The installation procedures and requirements vary for different types of container houses. For example, the air-cooling solution and the shelter solution differ from the typical solution for liquid-cooled energy storage systems in some procedures (such as liquid-cooling air-tightness testing), and adjustments should be made according to the specific product process documents.
  • The specific parameter standards for each procedure (such as the contact resistance limit and the compression requirement of the sealing strip) should be based on the product design documents, customer technical specifications, and applicable industry standards.