There are multiple feasible plans for designing a three-floor container house, and the specific choice should be made based on functional requirements, construction conditions, and technical characteristics. The following describes two typical cases:

Plan 1: Backyard Stacked Residence (Small-scale, Customized)
This plan targets family residences, emphasizing functional zoning and space utilization. The first floor adopts a sunken design, with the container buried underground as a hidden basement. First, a concrete foundation needs to be poured to ensure structural stability. After fixation, external waterproofing treatment is required, followed by covering with a thick insulation layer and backfilling with soil. This improves insulation performance and reduces noise. The second floor serves as the main living area. Door and window openings need to be cut out, and steel beams added to reinforce the structure. Inside, an embedded spa area and a reinforced platform can be set up to meet daily living needs. The third floor is a private upper level. Water and electricity installations are completed through metal frame wiring and piping, and the walls are sprayed with foam insulation material. The floors are connected by stairs. This plan requires attention to the foundation's bearing capacity to avoid settlement risks due to stacking, and professional design is needed to ensure structural stability.

Plan 2: Multi-purpose Office Building (Large-scale, Modular)
This case focuses on rapid construction and cost-effectiveness, using 96 containers (48 six-meter standard containers and 48 fourteen-meter extended containers) to complete a three-floor building in 11 days. Structurally, innovative technology is used to achieve a "slim" design: the top beam, bottom beam, and side beams are formed by bending 6-millimeter steel plates, reducing weight while ensuring strength. Construction adopts the integrated large-module forming technology, with "6-meter + 14-meter" modules welded and assembled in the factory, then directly spliced into complete functional units on-site, significantly shortening the construction period. The interior walls use uncoated zinc-magnesium-aluminum panels, reducing VOC emissions from paint spraying while providing long-term corrosion and moisture resistance and "self-healing" capabilities (surface scratches can be automatically oxidized and repaired). This plan requires advance planning of module combinations to ensure transportation and lifting feasibility, and structural calculations to verify overall stability.

Both plans must strictly comply with building codes, including fire protection, earthquake resistance, and load requirements. It is recommended to entrust a professional team for design and construction to ensure safety and compliance.