Construction of Prefabricated Beams for Houses
The construction of prefabricated beams for houses primarily adheres to the principle of 'factory-based production and on-site assembly installation'. The core processes include construction preparation, steel bar processing and binding, formwork installation, concrete pouring, on-site acceptance and storage, while also emphasizing construction management and compliance with standards. Specific key points are as follows:

1. Construction Preparation
Preparation must be completed in three aspects: technical, on-site, and material/equipment. Technical preparation involves developing a construction plan and conducting technical briefings; on-site preparation requires leveling the site, setting up a prefabrication yard, dividing it into areas for steel bar processing, pre-binding, prefabrication, storage, and loading, and reasonably configuring the number of prefabrication pedestals and beam storage pedestals based on the construction schedule. Material and equipment preparation involves ensuring the availability of raw materials such as steel bars, steel strands, anchors, and cement, inspecting and calibrating equipment like mixers, gantry cranes, and tensioning devices to ensure stable performance.
2. Steel Bar Processing and Binding
Steel bars are cut and bent in the processing area according to design drawings to ensure compliance with specifications in terms of size, shape, and quantity. The binding sequence is as follows: bottom plate bottom layer steel bars → web and flange plate stirrups → arrangement of prestressed ducts → top plate bottom layer steel bars → installation of top plate corrugated pipes, lifting rings, and positioning frames for embedded pipe fittings. Prestressed ducts must be fixed with '#'-shaped positioning steel bars and sealed at both ends with sealing tape to prevent grout leakage. Before concrete pouring, pipes, holes, anchor plates, etc., must be strictly embedded according to the drawings, as their accuracy directly affects the performance and lifespan of the beam.
3. Formwork Installation
Before formwork installation, it must be cleaned and coated with a release agent. The bottom formwork is placed on the beam fabrication pedestal, and its position and elevation are adjusted; the side formwork is lifted by a gantry crane and securely connected to the bottom formwork, with its perpendicularity and flatness adjusted. The internal formwork is erected after the bottom and web steel bars are bound, assembled in sections, and then lifted as a whole. It is supported at the bottom by steel bar stools, positioned by side plates with steel bars, and controlled from floating upwards by pressure bars on the top.
4. Concrete Pouring
Concrete is mixed at the batching plant according to the mix ratio to ensure workability and slump compliance, and segregation is prevented during transportation. Pouring is carried out using methods such as a skip hoist, progressing in layers from one end in the order of bottom plate → web (longitudinally segmented and horizontally layered) → the other end to avoid cold joints. Vibration is primarily performed with high-frequency attached vibrators, supplemented by immersion vibrators, with small-diameter vibrators used in areas with narrow material discharge gaps.
5. On-site Acceptance and Storage
After the prefabricated beams are transported to the site, their appearance quality, dimensional deviations, and reserved and embedded items must be inspected and accepted. If qualified, they are stored as required.
Construction Management and Compliance with Standards
A special management team must be established to clarify job responsibilities, such as the project manager being responsible for overall coordination and the technical leader being responsible for plan development and quality acceptance. Construction must strictly comply with regulations and standards such as the 'Code for Acceptance of Concrete Structure Construction Quality' (GB 50204-2015) and the 'Technical Standard for Prefabricated Concrete Buildings' (GB/T 51231-2016) to ensure quality and safety.




