Cement Prefabricated House Production License
The production license for cement prefabricated houses involves multiple steps, including project filing, construction permits, environmental impact assessments, and land use procedures. Different regions and projects need to handle corresponding permits according to specific circumstances.

Project filing is the foundational step for the production license. Enterprises are required to submit project filing applications to the local Development and Reform Commission, specifying key information such as project nature, scale, and location. For example, the production project of Yingshang Jinshi New Building Materials Co., Ltd., which produces 50,000 tons of cement prefabricated parts and 50,000 cubic meters of cement prefabricated houses annually, as well as the new project of Bengbu Xuanda Integrated Housing Co., Ltd., which processes 1,000 sets of integrated cement prefabricated houses annually, have both been filed with the local Development and Reform Commission, obtaining project codes and laying the foundation for subsequent permit processing.
Construction permits are approved by the housing and urban-rural development department. Enterprises must submit construction permit applications, and after review and approval, a Construction Permit is issued before construction can commence. For instance, the first phase of the cement prefabricated product processing and production project in Gaoluo Town, Xuan'en County, obtained a construction permit on July 30, 2025, marking the project's legal construction conditions.
Environmental impact assessment is a crucial step for the production license. Enterprises are required to prepare environmental impact report forms or reports and submit them to the ecological environment department for approval. After approval, enterprises must carry out construction in accordance with the content, processes, and environmental protection measures outlined in the report. For example, the project of Tongbai Dingxing Building Materials Co., Ltd., which produces 500,000 cubic meters of concrete and processes 3,000 cement prefabricated houses annually, as well as the project of Bengbu Xuanda Integrated Housing Co., Ltd., have both received principle approval from the ecological environment department but need to improve relevant environmental protection measures before construction begins.
Land use procedures must comply with the requirements of the natural resources department. Enterprises must ensure that the project land complies with the overall land use plan and handle land use approval procedures. The project of Tongbai Dingxing Building Materials Co., Ltd. explicitly requires the completion of land use procedures before construction begins, highlighting the importance of land use compliance for the production license.
In addition, different regions and projects may involve other specialized permits, such as safety production permits and fire protection acceptance. Enterprises need to comprehensively handle relevant permits according to the actual situation of the project and local policy requirements to ensure legal and compliant production.