The layout requirements for cement prefabricated houses mainly include three aspects: site selection and design, building modulus, and structural system and component splitting.

Site Selection and Design: The choice of construction site is the foundation of the layout. It is necessary to comprehensively consider factors such as geological conditions and surrounding environment to ensure that the foundation has sufficient stability and safety, providing reliable support for the house. At the same time, a detailed design plan should be formulated according to the purpose of the house. For example, residential houses should focus on comfort and living functions, and reasonably plan various functional areas. In addition, the design must strictly comply with local building codes to ensure that the house's load-bearing capacity meets the standards, the structure reasonably distributes the load, and potential safety hazards are avoided.

Building Modulus: A unified modulus is the key to the layout of cement prefabricated houses. The dimensions of all components should follow a unified modulus, generally with 300 millimeters as the basic modulus. For example, the bay can be 3.6 meters, 3.9 meters, or 4.2 meters; the depth can be 4.5 meters or 5.1 meters; and the floor height can be 2.8 meters or 3.0 meters. After the modulus is unified, the variety of components is greatly reduced, the turnover rate of molds is increased, and production costs are reduced accordingly.

Structural System and Component Splitting: In terms of the structural system, it is advisable to adopt an assembled monolithic concrete frame structure or a frame-shear wall structure. For buildings with three floors or less, a pure frame structure is preferred. Columns, beams, and slabs are all prefabricated, and the joint areas are formed into a whole with post-poured concrete to enhance structural stability. When splitting specifically, columns are split one per floor, with commonly used cross-sections of 400 millimeters by 400 millimeters or 500 millimeters by 500 millimeters; beams are split at the mid-span, with main beam cross-sections of 300 millimeters by 600 millimeters and secondary beam cross-sections of 250 millimeters by 500 millimeters; slabs use composite slabs, consisting of a 60-millimeter prefabricated base slab plus an 80-millimeter cast-in-place layer, with a total thickness of 140 millimeters. Stairs, balconies, and air-conditioning panels are also all prefabricated. The splitting principle is to control the weight of each component within 3 to 5 tons for easy lifting by ordinary truck cranes; the component dimensions should not exceed the transportation width limit of 2.5 meters and height limit of 4 meters to ensure transportation safety.