Cement Prefabricated House Foundation Prefabrication
The prefabrication process for the foundation of a cement prefabricated house mainly includes the following steps:

First, site leveling is carried out, which is a prerequisite for foundation construction. It is necessary to clear away stones, weeds, and other debris on the homestead and fill in the pits on the ground to ensure that the construction site is level and solid, providing a stable working surface for subsequent processes. If the site has soft soil layers or complex geological conditions, foundation treatment is also required to meet the bearing capacity requirements.
Next, layout work is conducted. Using a measuring tape and white lime powder, the positions and dimensions of the foundation are precisely marked on the ground. The layout should be carried out according to the design drawings to ensure that key dimensions such as the foundation axis and sidelines comply with the specifications. At the same time, the coordinates of each control point should be checked to avoid foundation misalignment due to measurement errors.
Then, excavation of the foundation pit is carried out. Using tools such as hoes and shovels, excavation is carried out according to the marked lines. The depth and width of the foundation pit should strictly comply with the design requirements of the prefabricated house. The depth usually needs to consider factors such as the bearing capacity of the foundation soil and the thickness of the permafrost layer, while the width should meet the operating space requirements for foundation construction and steel bar binding. During excavation, attention should be paid to the stability of the side slopes, and support measures should be taken if necessary.
After the foundation pit passes the inspection, cushion layer construction is carried out. The well-mixed concrete is poured into the foundation pit and leveled with a trowel. The thickness of the cushion layer is generally not less than 100mm, and the concrete strength grade should meet the design requirements. Its function is to isolate the foundation soil from the foundation, prevent the foundation soil from being disturbed, and provide a level working surface for steel bar binding.
After the cushion layer reaches a certain strength, steel bar binding is carried out. The steel bars are arranged according to the design pattern and fixed with iron wires. The specifications, quantities, and spacings of the steel bars should comply with the requirements of the design drawings, and the binding should be firm to avoid steel bar displacement. For foundations with large loads, steel bar supports or stirrup chairs should be set up to ensure the thickness of the concrete cover for the steel bars.
Finally, formwork erection and concrete pouring are carried out. After the formwork is erected, concrete is poured into it. After the concrete sets, the foundation is completed. The formwork should have sufficient strength and rigidity and be firmly installed to prevent formwork shifting and concrete leakage during the pouring process. Concrete pouring should be carried out in layers and vibrated densely to avoid quality defects such as honeycombs and pockmarks. After pouring is completed, timely curing is required to ensure the normal growth of concrete strength.