Cement Prefabricated House Foundation Construction
Admin 18 de septiembre de 2026
Cement prefabricated house foundation construction mainly includes construction preparation and various foundation construction methods, as detailed below:

Construction Preparation
- Technical Preparation: Organize technical personnel to study design drawings, geological survey reports, and relevant specifications, conduct drawing review meetings, and prepare technical disclosure documents for construction, plans for the entry of prefabricated components, lifting sequences, and installation plans, and perform mechanical calculations.
- Instrument Preparation: Prepare measuring instruments such as total stations and level gauges, as well as measuring tools, ensuring they are within their calibration validity periods and in good working condition; establish a standard curing room and prepare compression test molds and flexural test molds for concrete strength testing.
- Material Preparation:
- Cement: Use ordinary Portland cement (P·O42.5R), with performance indicators meeting the requirements of the "General Portland Cement" (GB 175 - 2023) standard.
- Sand: Select medium-coarse sand with a fineness modulus controlled between 2.5 and 3.5, a mud content of ≤3%, and a clay lump content of ≤1%.
- Gravel: Select crushed stone with a particle size of 5 - 20mm, a crushing index of ≤10%, a flaky and elongated particle content of ≤15%, and a mud content of ≤1%.
- Reinforcing Steel Bars: Select HRB400 reinforcing steel bars that meet national standards, with a yield strength of 400MPa. Conduct mechanical performance tests after arrival, and only use them if they pass the tests.
- Mixing Water and Admixtures: The water quality must meet a pH value of ≥6.5, a chloride ion content of ≤200mg/L, and a sulfate content of ≤2000mg/L; the admixture is a polycarboxylate-based high-performance water reducer with a water reduction rate of ≥25%, a chloride ion content of ≤0.1%, an alkali content of ≤10% (calculated as Na₂O + 0.658K₂O), and good compatibility with cement.
- Site Preparation: Clear away obstacles such as debris, trees, and stones from the site, use equipment such as bulldozers and excavators to level the site, ensuring a slope of ≤2%, and compact the site to ensure the bearing capacity of the foundation meets construction requirements; during base layer treatment, remove surface laitance and oil stains. For oily areas, scrub with a 10% caustic soda solution and then rinse with clean water.
Foundation Construction Methods
- Compaction Method: Reinforce the foundation by continuously compacting the soil layer on the original foundation using pneumatic hammers or heavy rollers to artificially increase soil density until it meets the bearing capacity standards for self-built houses.
- Soil Replacement Method: Artificially replace the loose soil on the house foundation with materials suitable for foundation use and with high density for backfilling, although this method is relatively costly.
- Piling Method: Embed piles into relatively soft soil layers, typically using sturdy reinforced concrete column piles, to increase the stability of the foundation. This method is simple to operate but has limited bearing capacity and is mostly used for small buildings. Prefabricated concrete square piles can also be used.
- Cement Pouring Method: First, set out and dig pits, then bind a complete reinforcing steel bar framework inside the pits, and finally pour cement to form the foundation.