Volver al blog
Artículo

Binzhou Container House Installation

Admin 15 de septiembre de 2026

For container house installation in Binzhou, you can contact local professional integrated housing companies such as Shandong Xinhao, Shandong Zhongyu, and Shandong Bojin Lvjian. They offer one-stop services including design, production, and installation. You need to choose the type according to your needs and pay attention to the installation specifications and procedures.

Installation Service Providers

There are several enterprises in Binzhou that specialize in container house installation. For example, Shandong Xinhao Integrated Housing Co., Ltd. is located in Weifang, Shandong. Its products are distributed nationwide and include standardized and modular products such as packing-box units and detachable packing boxes. It has a professional design team and decoration team and can undertake temporary construction projects on construction sites and customized light-steel houses. Shandong Zhongyu Integrated Housing Co., Ltd. supports customization to meet special procurement needs. Its products include expansion boxes, butterfly boxes, and wing-expansion boxes, which are modular and can be moved as a whole. It also provides timely response and 24-hour problem-solving services. Shandong Bojin Lvjian Integrated Housing Co., Ltd. is also engaged in businesses related to container houses, packing-box units, and movable panel houses.

Types of Container Houses

Common types of container houses include packing boxes, expansion boxes, and folding boxes. Packing boxes adopt modular design and factory production. Using the box body as the basic unit, they can be used alone or combined into spacious spaces and can also be stacked vertically. Expansion boxes offer flexible space expansion, convenient construction, durability, energy efficiency, and can be customized. Folding boxes can be easily folded and unfolded, are convenient for transportation, quick to set up, have flexible spaces, and are both stable and adaptable.

Installation Specifications and Procedures

Taking assembled box houses as an example, during installation, first connect the box bottom corners with the bottom beams on a flat ground or workbench. Use hexagon socket bolts for connection but do not tighten them temporarily. After adjusting to ensure that the diagonal difference of the bottom frame is ≤3mm, tighten the bolts. Then, install the π-shaped secondary beams according to the positioning hole positions on the long beams and fix them with self-tapping screws. The tops of the π-shaped secondary beams and the bottom beams need to be fixed with round-head drill-tail screws. Next, lay the floor base plates along the 6-meter direction. Mark the middle line of the π-shaped beams and then lay the floor. Snap a chalk line according to the mark and fix the floor with cross flat-head燕尾丝 (Note: '燕尾丝' may need further clarification in an actual English context; here it's kept as is for the original meaning). Finally, sand the entire floor, apply PVC special floor adhesive, wait, and then lay the floor covering and expel the air. If possible, perform welding treatment on the joints of the floor covering.