The installation of container houses in Zunyi can be completed by contacting local professional installation companies or manufacturers, and the installation process needs to follow standardized procedures and ensure that the basic conditions meet the requirements. Here is the specific information:

I. Installation Service Providers There are several companies in Zunyi that provide installation services for container houses, such as:
- Guizhou Caikang Prefabricated Building Co., Ltd.: It offers design and installation services for containers, movable board houses, light-steel villas, etc., covering the entire Zunyi area. With over 10 years of professional experience, it can provide factory-direct sales services.
- Yihang Containers: It provides customized services for movable houses and installation services for container houses. It has served more than 3,000 people in the past year, and its business covers Fenggang and other places.
- Zunyi Hongshun Steel Structure Co., Ltd.: It provides rental, sales, and installation services for foldable containers, flat-panel containers, packing-box units, etc.
- Zunyi New Generation Glass Products Co., Ltd.: It mainly engages in the installation of containers and movable board houses, and provides wholesale, sales, and production and processing services.
II. Key Points of the Installation Process The installation of container houses needs to follow standardized steps. Taking the installation of the bottom frame as an example:
- Foundation Preparation: Operate on a flat ground or workbench to ensure that the ground bearing capacity meets the requirements.
- Bottom Frame Connection: Connect the bottom corners of the container to the bottom beams with hexagon socket bolts and do not tighten them temporarily; adjust the diagonal difference of the bottom frame to be ≤ 3mm and then tighten the bolts.
- Secondary Beam Installation: Install π-shaped secondary beams according to the positioning holes of the long beams and fix them with self-tapping screws; the tops of the secondary beams and the bottom beams need to be reinforced with round-head drill-tail screws.
- Floor Laying: Lay the magnesium oxide board substrate along the 6-meter direction and cut the corners according to the chalk lines; mark at the center line of the π-shaped beams for floor nailing positioning; the joints of the floors should coincide with the center line of the π-shaped beams, fix them with cross-flat-head燕尾丝 (Note: '燕尾丝' may be a specific term, here it is kept as is for accuracy, it could be translated as 'dovetail screws' if it has a specific meaning in the context), and the nailing interval is 300-350mm.
- Floor Treatment: Polish the joints of the boards, apply PVC special floor adhesive, lay the floor covering and expel the air, and welding treatment can be carried out at the joints.
III. Installation Precautions
- Foundation Conditions: The installation ground should be flat and solid to avoid house deformation due to foundation settlement.
- Sealing: The joints of the containers should be treated with sealant to prevent rainwater leakage.
- Fire Prevention and Corrosion Resistance: Use fireproof boards or rock wool boards as wall materials and regularly check the anti-corrosion coatings.
- Professional Operation: Tasks involving steel structure welding, bolt tightening, etc., should be completed by professionals to ensure structural stability.