There are businesses related to prefabricated concrete houses in Zhaoxian, with various construction forms and different prices.

Construction Forms

  • Concrete Box House Villas: Zhaoxian has concrete box house villas as a form of prefabricated concrete housing, providing local residents with a unique living option.
  • Prefabricated Steel Structure Construction: When using prefabricated steel structure construction, some components of the house, such as walls, can be prefabricated in the factory. After prefabrication, they are transported to the site for installation. This construction method is highly efficient. For example, the main body of the house of Wang Gang, a villager in Dawangzhuang Village, Weixian County, was completed in just 10 days, with only 5 - 6 workers on site, completing the construction like assembling building blocks. This greatly shortens the construction cycle and reduces the complexity and labor requirements of on-site construction.
  • EPS Building Module Construction: Zhaoxian Ruizhi Construction Engineering Company uses EPS building modules for construction. The modules are produced in the factory and then transported to the site, where they are assembled into cavity walls. Then, steel bars are placed inside, and concrete is poured to complete the main structure of the house. This construction method combines the advantages of modular production and on-site pouring, ensuring both construction convenience and good structural performance of the house.

Price Situation

The prices of prefabricated concrete houses in Zhaoxian vary, with different price levels such as 240.00 yuan/square meter, 255.00 yuan/square meter, and 300.00 yuan/square meter. The differences in prices may be affected by various factors, such as the construction form, the size of the house, the quality of the materials used, and the complexity of the construction process. Different construction forms have different cost compositions. Prefabricated steel structure construction may involve the production and installation costs of the steel structure, while EPS building module construction has the production cost of the modules, all of which are reflected in the final house price. At the same time, the larger the house size, the more materials and construction work are required, and the price may increase accordingly. Using better-quality materials will also lead to a price increase. The more complex the construction process, the higher the technical requirements for construction workers, and the increase in labor costs will also result in a higher house price.