Back to blog
Article

Xuancheng Environmental Protection Mobile Toilet Bidding

Admin September 20, 2026

The following is the bidding information for environmental protection mobile toilets in Xuancheng:

I. Mobile Toilet Procurement Project for Xuancheng Youth Activity Center This project adopts the inquiry procurement method, with the project number XCSHDZX-2023002. The budget amount and the maximum limit price are both 77,000 yuan. The procurement requirement is for 1 set of mobile toilet, including 1 toilet cubicle + 1 management room, with a steel frame structure. The specific technical parameters are strictly required: the net width of the toilet cubicle is ≥1100mm, the net depth is ≥1500mm, and the net height is ≥2100mm; the net width of the management room is ≥2000mm, the net depth is ≥2200mm, and the net height is ≥2400mm. The power supply is municipal electricity at 220V/50Hz, the water supply relies on municipal tap water, flushing uses a low-level water tank, sewage is discharged directly to a septic tank through water flushing, and fecal treatment is carried out through fermentation, degradation, and purification in a fiberglass septic tank. The equipment needs to adapt to an ambient temperature range of -15°C to 50°C and a humidity of ≤95%. The sanitary ware is made of water-saving ceramic materials, and all materials must comply with green environmental protection standards. In addition, the seismic resistance level should meet Degree 7, the wind resistance level should meet Level 12, the weld quality should reach the national secondary standard, and the emissions of wastewater and waste gas should comply with the national minimum standards. Finally, Shanghai Luting Industrial Co., Ltd. won the bid with a price of 39,800 yuan, significantly lower than the budget amount.

II. Mobile Toilet Procurement, Installation, and Maintenance Project in Xuancheng Urban Area This project is implemented through public bidding, with the project number xzcz-098. The bidding scope covers the procurement, installation, and maintenance of 12 sets of mobile environmental protection toilets, with each set including 4 unisex toilet cubicles + 1 management room, and equipped with a 6-cubic-meter fiberglass finished septic tank and foundation works (such as septic tank excavation and civil construction). The total project budget is 2.6 million yuan, of which the civil foundation part accounts for about 200,000 yuan. The supply and installation locations are designated by the purchaser in the urban area of Xuancheng. The bidding content not only includes equipment supply but also involves construction installation and subsequent maintenance services, emphasizing full-process management. This project is relatively large in scale, with technical requirements similar to those of the first project, but it focuses more on the integrated procurement of multiple sets of equipment and regional coverage, making it suitable for large-scale environmental sanitation facility upgrades in urban public areas.