Wusu Mobile Toilet Construction
The core information about the mobile toilet construction in Wusu is as follows:

1. Construction Scope and Locations
The mobile toilet construction sites along the G217 highway (Wusu section) in Tacheng Prefecture in 2025 are clearly identified as two locations: K610 and K659 on the Duku Highway (Wusu section). Both sites are located along key tourist routes across Xinjiang, aiming to improve tourist facilities and enhance the visitor experience.
2. Construction Duration
The total project duration is 35 calendar days, with specific start and end dates to be determined by the contract. This duration takes into account the actual needs of mobile toilet installation and construction, including equipment transportation, foundation work, commissioning, and acceptance.
3. Construction Content
The core task of the construction is the installation and construction of mobile toilets, which are part of a subsidy project for supporting facilities along key tourist routes across Xinjiang. Such projects typically require toilets to be environmentally friendly, convenient, and durable, possibly adopting modular designs or ecological treatment technologies to accommodate high-traffic usage scenarios in tourist areas.
4. Management Standard References
If the construction involves temporary mobile toilets at construction sites, the following standards must be followed:
- Location Layout: Toilets should be located more than 10 meters away from the construction area to minimize impact on construction activities; the ratio of male to female toilet stalls should be 1:3 to meet actual needs.
- Daily Cleaning: Toilets should be cleaned at least twice a day to maintain hygiene and prevent odors and stains from accumulating.
- Safety and Hygiene: Emergency lighting equipment should be provided to ensure safety during nighttime use; regular disinfection (e.g., daily or after every 50 uses) should be carried out to prevent the spread of germs.
Note: The above standards are general requirements for mobile toilets at construction sites. Whether they fully apply to the specific project in Wusu needs to be confirmed based on actual design documents or the requirements of the purchasing party.
5. Additional Information
For further details on suppliers, project managers, etc., please contact the purchasing party, the Culture, Sports, Radio, Television, and Tourism Bureau of Tacheng Prefecture, Ili Kazakh Autonomous Prefecture (Phone: 0901-7698812).




