Renovation of Prefabricated Panel Houses in Wenzhou
The renovation of prefabricated panel houses in Wenzhou can be advanced through self-financing by homeowners and government policy support for original demolition and reconstruction, with Leqing Hongyuan Community serving as a typical case, and the '15th Five-Year Plan' explicitly supporting such renewal models.

I. Renovation Case of Leqing Hongyuan Community: Practice of the Self-Initiated Renewal Model
Leqing Hongyuan Community was built in 1986 and consists of 4 buildings with 52 households of prefabricated panel structures. It was identified as a C-grade dilapidated building in 2015 and upgraded to a D-grade in 2025. After long-term waiting for government acquisition without success, the homeowners initiated self-initiated renewal with policy support from 2024 to 2025. Key experiences include:
- 100% Homeowner Signing: All homeowners reached a consensus and fully self-financed the reconstruction funds amounting to 10.1 million yuan, with an average of about 200,000 yuan per household, demonstrating the feasibility of resident-led initiatives.
- Original Demolition and Reconstruction Design: After reconstruction, the unit types were upgraded from two-bedroom to three-bedroom units, elevators were added, and parking spaces were provided, significantly improving living quality and addressing pain points such as the lack of elevators and parking difficulties in prefabricated panel houses.
- Policy Pilot Support: Leqing City listed it as a pilot project for self-initiated renewal, simplifying the approval process and providing a replicable process template for subsequent projects.
- Clear Time Planning: The project started in 2024 and is expected to be completed by June 2027, with a duration of about 3 years, providing a time reference for similar projects.
II. Policy Support: Clear Direction at the National Level
The 'Urban Renewal 15th Five-Year Plan' issued by the State Council in May 2026 proposes to 'support the self-initiated renewal and original demolition and reconstruction of old housing and explore sustainable operation models', providing a top-level design basis for the renovation of prefabricated panel houses in Wenzhou. Policy highlights include:
- Legalization of Self-Initiated Renewal: It is clarified that residents can advance renovations through self-financing and government guidance, breaking through the traditional model of 'government-led acquisition'.
- Priority for Original Demolition and Reconstruction: It encourages reconstruction on the original site, preserving community networks, reducing relocation costs for residents, and meeting urban planning requirements.
- Exploration of Sustainable Operation: It requires that renovated projects consider long-term maintenance funding sources to avoid the problem of 'reconstruction leading to debt', such as balancing costs through parking space rentals and property value appreciation.
III. Feasibility Analysis of Renovation: Synergy between Resident-Led Initiatives and Policy Support
The renovation of prefabricated panel houses in Wenzhou needs to meet three key elements: 'unified resident willingness, feasible self-financing, and in-place policy support'. The case of Leqing Hongyuan demonstrates that when buildings are highly dilapidated and residents have an urgent need for renovation, the self-initiated renewal model can be advanced efficiently. In the future, with the implementation of the '15th Five-Year Plan', other prefabricated panel houses in Wenzhou can be renovated through the process of 'community consultation - fundraising - policy approval - construction', gradually addressing safety hazards and improving living functions.




