Bidding Document for Vehicle-Mounted Mobile Toilets

Admin September 20, 2026

Key points of the bidding document for vehicle-mounted mobile toilets are as follows:

I. Project Basic Information The project numbers, names, and budgets vary significantly among different projects. For example, the project 'Purchase of Mobile Vehicle-Mounted Public Toilets' has the number HBWY-2025010, a budget of 2.76 million yuan, and involves the purchase of 2 vehicle-mounted public toilets; the 'Jungar Banner Vehicle-Mounted Mobile Restroom' project has the number ESZCZQS-G-H-240366, a budget of 780,000 yuan, and involves the purchase of 1 unit; in the '2026 Sanitation Facility Procurement Project (Second Round)', Package 2 involves other specialized vehicles with a budget of 1.7491 million yuan. The bidding documents should clearly specify the project number, name, budget, and maximum price limit to avoid confusion.

II. Procurement Requirements and Technical Specifications The procurement items include the quantity of vehicle-mounted public toilets, technical parameters, and their uses. For example, the 'Purchase of Mobile Vehicle-Mounted Public Toilets' project requires the products to be of qualified quality and meet industry standards; the 'Jungar Banner Project' requires detailed information to be found in the procurement documents; the 'Mobile Toilet Vehicle Procurement Project (Example)' specifies that the vehicles are for urban events, emergencies, etc., and include the main body, supporting equipment, and installation and commissioning. Technical specifications should be detailed down to dimensions, sewage discharge methods, energy consumption, etc., to ensure accurate responses from suppliers.

III. Contract Performance Period The performance periods vary by project: the 'Purchase of Mobile Vehicle-Mounted Public Toilets' project requires delivery and commissioning within 60 days after contract signing; the 'Jungar Banner Project' only mentions 'meeting the needs of the purchaser'; the '2026 Sanitation Facility Procurement Project (Package 1)' specifies 30 calendar days. Reasonable periods should be set according to project complexity, and liability for delays should be clearly defined.

IV. Bidding Document Acquisition and Bidding Process

  1. Acquisition Methods: Mostly available for online download (e.g., Shijiazhuang Public Resources Trading Platform, Inner Mongolia Autonomous Region Government Procurement Network), with some being free and others requiring on-site purchase.
  2. Time Nodes: The start and end dates and daily time slots should be clearly specified (e.g., 'From June 9 to 13, 2025, from 8:00 to 18:00 daily').
  3. Bidding Deadline and Bid Opening: Usually at the same time, with remote bid opening (e.g., Shijiazhuang project) or on-site bid opening (e.g., Jungar Banner project). The deadline should be emphasized to the minute to avoid ambiguity.

V. Bid Evaluation Methods and Criteria Taking the 'Mobile Toilet Vehicle Procurement Project (Example)' as an example, a comprehensive scoring method is used:

  • Bid Price (30%): The lowest price gets full marks, with 1 point deducted for each 1% increase.
  • Technical Parameters (30%): Evaluate advancement and reliability.
  • Enterprise Strength (20%): Examine qualifications and performance.
  • After-Sales Service (20%): Focus on the service system and commitments. Scoring criteria should be quantified to reduce subjective judgment.

VI. Bidder Qualification Requirements General conditions include: independent legal entity status, a valid business license, no major illegal records, and similar project experience. Some projects additionally require safety production licenses or quality inspection reports. Qualification reviews should be strict to ensure the supplier's ability to perform the contract.