Prefabricated houses are a form of construction where building components are industrially produced and assembled on-site, offering advantages such as shortened construction periods and reduced pollution. Taking the construction of prefabricated houses in rural South Korea as an example, this article introduces the construction process and key information:

Construction Process
- Foundation Construction
- Leveling the Foundation and Pouring the Sub-base: First, clear away weeds and level the foundation. Excavate foundation pits and measure to ensure the excavation depth and ground height meet design requirements. After excavating approximately 60 centimeters, lay down white plastic sheeting and use a concrete pump truck to pour the foundation. This foundation does not use steel reinforcement. The white plastic sheeting prevents moisture loss from the concrete, promotes hydration reactions, and enhances the strength and durability of the concrete.
- Installing Foundation Piles and Assembling Beams: After the concrete has set, install the foundation plates. Use a drill to create holes and secure them with expansion screws, fixing the foundation piles to the sub-base. Install six prefabricated foundation piles, each weighing about 5 tons, and assemble the beams like building blocks. After leveling and adjusting, secure them with nuts. Fill the gaps between the beams and foundation piles with expanding foam, and seal the nut fixtures with cement.
- Subsequent Foundation Treatment: Backfill with soil and lay down a 10-centimeter-thick layer of large foam boards for insulation and moisture protection. Lay a dense network of threaded steel bars across the entire foundation frame. Workers manually screw each steel bar into the pre-reserved threaded holes and then bind all the joints together using a binding machine to form a cohesive structure.
- Main Structure Construction
- Second-Floor Construction: Load-bearing columns and beams are fully prefabricated in the factory. On-site workers direct cranes to precisely assemble the multi-ton components, aligning protrusions with recesses and tightening nuts. The second-floor frame is completed in less than half a day. Then, lay down a thin 5-centimeter floor slab, pressing the ends less than 5 centimeters onto the beams. Seal all gaps with expanding foam, perform secondary grouting at the connections of the load-bearing columns, and finally lay down a steel bar mesh and pour concrete to form a unified structure.
Other Information
The main types of prefabricated houses include panel-assembled, box-assembled, and frame-assembled types, with technologies covering prefabricated concrete structures and steel structures. Components include prefabricated products such as beams, slabs, walls, and columns. China's prefabricated concrete technology began in the 1950s, initially applied in factory and residential construction. It experienced a resurgence in the 21st century due to its production efficiency and environmental advantages. Companies like Vanke Group have developed prefabricated shear wall residential structural systems and applied prefabricated frame technologies in engineering projects.