Movement of Toilet Squat Hole Position
Admin September 21, 2026
The position of the toilet squat hole can be moved under certain conditions, but careful planning and professional construction are required.

Moving the position of the toilet squat hole is usually achieved by reinstalling or using a position shifter. The specific steps and precautions are as follows:
I. Steps for Reinstalling the Squat Hole
- Remove Existing Facilities Remove the existing squat toilet, tiles, water pipes, etc. During this process, avoid damaging the surrounding floor or walls. If the waterproof layer is involved, it needs to be redone; otherwise, leakage problems may occur.
- Adjust Pipeline Layout Relay the sewage and drainage pipes according to the new position. This is the core step. Ensure that the pipeline direction and slope meet the drainage requirements (usually a slope of 2%-3%) to avoid blockage or odor. If the relocation distance is long, a new pipeline trench may need to be excavated on the ground; if existing pipelines are to be used for renovation, their load-bearing capacity needs to be evaluated.
- Reinstall the Squat Toilet Fix the squat toilet at the new position, connect the drainage pipes, and perform sealing treatment (such as using glass glue or cement). After installation, test the drainage function to ensure there is no leakage and the flushing is smooth.
II. Plan for Using a Squat Toilet Position Shifter
- Selection of Position Shifter Types
- Flat-tube Position Shifter: Suitable for long relocation distances (generally no more than 50 centimeters), but the pipeline slope must be strictly guaranteed; otherwise, it is prone to blockage.
- Integrated Position Shifter: Suitable for short relocation distances (usually no more than 20 centimeters). It is preferred for bathrooms with limited space. If a model with a waterproof bend is selected, it can effectively prevent odor diffusion.
- Limitations of Position Shifters Although position shifters are flexible and economical, they may increase drainage resistance and easily lead to pipeline blockage with long-term use. Therefore, they are only recommended as a temporary solution for short relocation distances, not as a long-term solution.
III. Key Precautions
- Cost and Complexity Moving the squat hole involves pipeline renovation, waterproofing treatment, and floor repair, which are costly and complex in construction. If new pipelines need to pass through the floor slab, coordination with the downstairs residents is also required, which may increase coordination costs.
- Impact on Floor Height Relaying pipelines may cause the bathroom floor to rise, affecting the opening of the door frame or the comfort of use. The floor height needs to be planned in advance to avoid subsequent rework.
- Requirements for Professional Construction The renovation process involves plumbing and electrical work, which must be carried out by certified professionals to ensure compliance with building codes and safety standards. Self-construction may lead to risks such as water leakage and electrical failures.
Summary: Moving the position of the toilet squat hole requires a comprehensive evaluation of the relocation distance, pipeline conditions, and budget. It is advisable to prioritize professional construction teams and choose between reinstallation or position shifter plans according to needs to balance functionality and economy.